NOMARCHIA Station(Station and Crossover): In the area of the crossover, in progress are painting works and works for the installation of the automatic fire fighting system.
ARETSOU Shaft: In progress are works for the installation of collectors for the automatic fire fighting system.
NEA KRINI Station: In progress are works for the installation of stainless steel balustrades and works for the installation of collectors for the automatic fire fighting system.
MICRAStation (Station and Crossovers): In the area of the 2nd Crossover, in progress are surface reinstatement works and works for the installation of sound absorbing panels in the ventilation areas.
TRACKWORK: In progress are works for the installation of electrical trays and their earthing at NOMARCHIA Crossover – track level. In progress are also the concreting works of the turnout / crossover slab R100/500 in the Forestation area.