The first TBM (TBM1) has constructed 2300m of tunnel, while the second (TBM2) has constructed 1350m. of parallel tunnel.
The construction of diaphragm walls at PANEPISTIMIO and EFKLIDIS Stations is in progress, while the respective works at FLEMING Station commenced.
Works related to the construction of the metal bridge at VENIZELOU and AGHIA SOFIA Stations are in progress.
Works related to PUO network at the eastern section of the project are at a final stage. The surface worksite area will be reduced soon and the construction works will be executed below surface.