March 2012
- In Thessaloniki Metro, the two (2) first escalators have been installed at EFKLIDIS Station.
 - The works for the construction of the roof slab at Sindrivani Station are in progress.
 - The excavation works for the construction of the slab at level -2 of Analipsi Station are at an advanced stage.