Piraeus Project progress July 2013 06/08/2013 / The worksite installation works, as well as the assembly of the Tunnel Boring Machine (TBM) at the TBM access shaft are in full swing. The 3rd phase of the traffic arrangement in the area of KORYDALLOS Station is in full operation.