- The assembly of the Tunnel Boring Machine (TBM) in the Access Shaft is at the completion stage;
- The works for the construction of piles and the pile cap beam in KORYDALLOS Station are in progress;
- The dismantling works at the surface level and the works for the PUO networks diversion in the area of NIKEA Station are in progress;
- The construction of the passageways was completed, while the networks diversion works onthe sidewalks in DIMOTIKO THEATRO Station are in progress.