Kritis Shaft: The works related to the interior ventilation network have been completed.
NOMARHIA Station: In progress are works related to earthing (ducts), distribution (controls – settings – installation – connections of switchboards, installation of supply cables – electrical material – other equipment), lighting (cubicles, cables, lighting fixtures), ventilation (air ducts, dampers, fans, supports), smoke exhaust (setting into operation, controls), air conditioning (insulations, layouts), hydraulic (tests), lifts (lift house, façade frames), platform screen doors (operational controls), surveillance systems (signals cables) and low voltage (fiber optics, speakers, electronic signs, cables, field equipment).
KALAMARIA Station: In progress are works related to earthing (ducts), distribution (controls – settings – installation – connections of switchboards, installation of supply cables – electrical material – other equipment), lighting (cubicles, cables, lighting fixtures), ventilation (air ducts, dampers, fans, supports), smoke exhaust (setting into operation, controls), air conditioning (insulations, layouts), hydraulics (piping), platform screen doors (operational controls), fire detection (installation of the system), surveillance systems (signals cables) and low voltage (trays, fiber optics, speakers, electronic signs, cables).
ARETSOU Station: In progress are electromechanical works related to the infrastructure (trays), works related to earthing (ducts), distribution (controls – settings – installation – connections of switchboards, installation of supply cables – electrical material – other equipment), lighting (cubicles, cables, lighting fixtures), ventilation (supplementary works), smoke exhaust (setting into operation, controls), hydraulics (tests), firefighting (connections), platform screen doors (operational controls), fire detection (system installation), surveillance systems (tests), and low voltage (fiber optics, speakers, electronic signs, cables).
NEA KRINI Station: In progress are works related to distribution (controls – settings – installation – connections of switchboards, installation of supply cables – electrical material – other equipment), ventilation (supports, air ducts, insulations), smoke exhaust (setting into operation, controls), hydraulics (tests), fire protection (tests), firefighting (tests), platform screen doors (operational controls), fire detection (system installation), surveillance systems (tests), and low voltage (cabinets, connections).
MIKRA Station: In progress are works related to earthing (ducts), distribution (installation – connections of switchboards, installation of supply cables, connections of fans), ventilation (air-ducts, dampers, fans, supports), smoke exhaust (setting into operation, controls), air conditioning (insulations, layout, piping), water supply (piping),
platform screen doors (operational controls), fire detection (system installation), surveillance systems (signals cables), and low voltage (trays, fiber optics, speakers, electronic signs, cables).
Tunnels: Completed are all infrastructure and trackwork related activities, as well as the electromechanical works pertaining to medium voltage distribution, earthing, traction, lighting and firefighting systems. Works related to earthing, radio communications and hydraulic tests have been executed.