August 2023

Καλαμαριά Αύγουστος 2023
  • NOMARCHIA Station (Station and Crossover): In progress are works for the installation of fire-rated hatches, while completed are asphalt laying and striping works on Mitropolitou Kydonion Street.
  • KALAMARIA Station: In progress are works for the installation of fire-rated hatches.
  • ARETSOU Station: Completed are works for installation of the water heaters of the water supply system. In progress are slab paving works, works for the construction of the infrastructures of the lighting-irrigation system at street level, as well as works for the installation of granite flooring at platform level.
  • NEA KRINI Station: In progress are slab paving and asphalt laying works at street level. In progress are works for the installation of a lift housing structure, while works for the installation of the equipment mounting tracks at the tunnel ventilation system are completed.
  • MIKRA Station (Station and Crossovers): At the station, in the 1st and 2nd crossovers in progress are works for the installation of the fire detection system, while at the 1st crossover the works for the installation of the equipment mounting tracks for the tunnel ventilation system have been completed.