Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

March 2020

NOMARCHIA Station (station & crossover): The works for the installation of granites at the platform level have been completed.

KALAMARIA Station: In progress are works for the reinstatement of the surrounding area, the paving of cement mortar for the sub-base of granites at the platform, as well as the works for the installation of the fire fighting network, the sewage network, the tunnel ventilation network (fire-rated air ducts) and the piping for the lighting network, the power distribution network and the low voltage network.

ARETSOU Station: The works for the installation of acoustic panels in the staircase areas are in progress.

MIKRA Station (Station & Crossovers): In progress are the works for the installation of granites at the ticketing level. At the 1st crossover, in progress are the works for the installation of tiles in the WC areas, as well as the works related to the sewage network.

TBM tunnels: The works for the construction of trackwork at a tunnel section are in progress.

Print Friendly, PDF & Email
WCAG