Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

September 2014

  • The survey – through investigation trenches – of the locations where dual underground litter bins are constructed is in progress at the sidewalks of Grigoriou Lambraki street (at the sidewalk opposite of and next to the tramway corridor);
  • The urban planning works at the traffic island between Mikras Asias and Pireos streets, at the U-turn of Lambraki street, are in progress;
  • The formworks have been completed, while the steel reinforcement for the construction of the bridge at Myrtidiotissa are in progress;
  • The works for the relocation of the sewage pipe have been completed, while the works for the relocation of the storm water pipe and the urban planning at the sidewalk opposite to Mikras Asias street have commenced;
  • The works for the installation of poles concerning the relocation of Trolleybus line No. 20 (from Vas. Georgiou street) was completed, while the network works for the completion of the line at Bouboulinas street have commenced;
  • The technical works along the Tramway corridor (in the area of the foreseen Karaiskaki stop, at Lambraki bridge etc.) continue, while the works for the relocation – arrangement of PUO networks have commenced.
WCAG