{ "@context": "http://schema.org", "@type": "BreadcrumbList", "itemListElement": [ { "@type": "ListItem", "position": 2, "item": { "@id": "https://www.emetro.gr", "name": "Home" } } , { "@type": "ListItem", "position": 3, "item": { "@id": "#", "name": "Post" } } , { "@type": "ListItem", "position": 4, "item": { "@id": "https://www.emetro.gr/?p=23143&lang=en", "name": "March 2022" } } ] }

Καλαμαριά Μάρτιος 2022
Kalamaria Project progress

March 2022

• Kritis Shaft: In progress are works for the installation of tunnel ventilation equipment.
• NOMARCHIA Station (Station & Crossover): In progress are works for the installation of Inergen cylinders in the Crossover.
• ARETSOU Station: In progress are works for the installation of granite flooring in entrances (surface level) and the execution of SAT tests.
• NEA KRINI Station: In progress are works for final checking and adjustments of the Platform Screen Doors.
• MICRA Station: In progress are works for the construction of infrastructure for the lighting and irrigation networks, as well as works for the installation of granite flooring in entrances (surface level).
• TRACKWORK: In progress are works for the installation of crossovers/crossing in the area of Nomarchia Crossover.