{"id":9096,"date":"2017-05-19T13:37:02","date_gmt":"2017-05-19T10:37:02","guid":{"rendered":"https:\/\/www.emetro.gr?p=9096"},"modified":"2024-06-25T13:16:55","modified_gmt":"2024-06-25T10:16:55","slug":"april-2017-3","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=9096&lang=en","title":{"rendered":"April 2017"},"content":{"rendered":"<p>\u2022 At Ethnarhou Makariou street, the construction of the staircase connecting Karaiskaki stop with the underground pedestrian walkway has been completed.<\/p>\n<p>\u2022 At Lambraki bridge, the construction of the pedestrian bridge and the widening of the sidewalk are in progress.<\/p>\n<p>\u2022 At Grigoriou Lambraki street, the tramway corridor from the Lambraki reversal up to Vas. Georgiou street is completed.<\/p>\n<p>\u2022 At Vas. Georgiou street, street lighting works are in progress at the sidewalk facing Gr. Lambraki street up to Iroon Polytechniou street.<\/p>\n<p>\u2022 On Omiridou Skylitsi street, in progress are the works for the construction of the Tramway corridor, as well as the urban planning works, from Ippodamias square up to 34th Syntagmatos street.<\/p>\n<p>(the reference to the \u201cadjacent\u201d or \u201cfacing\u201d sidewalk relates to the actual location of the tramway corridor).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u2022 At Ethnarhou Makariou street, the construction of the staircase connecting Karaiskaki stop with the underground pedestrian walkway has been completed. \u2022 At Lambraki bridge, the construction of the pedestrian bridge and the widening of the sidewalk are in progress. \u2022 At Grigoriou Lambraki street, the tramway corridor from the Lambraki reversal up to Vas. Georgiou street is completed. \u2022 At Vas. Georgiou street, street lighting works are in progress at the sidewalk facing Gr. Lambraki street up to Iroon Polytechniou street. \u2022 On Omiridou Skylitsi street, in progress are the works for the construction of the Tramway corridor, as well as the urban planning works, from Ippodamias square up to 34th Syntagmatos street. (the reference to the \u201cadjacent\u201d or \u201cfacing\u201d sidewalk relates to the actual location of the tramway corridor).<\/p>\n","protected":false},"author":4,"featured_media":9081,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[572],"tags":[],"class_list":["post-9096","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tram-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Tram_4_17_1-scaled.jpg",2560,1853,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Tram_4_17_1-scaled.jpg",2560,1853,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Tram_4_17_1-scaled.jpg",2560,1853,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Tram_4_17_1-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Tram_4_17_1-300x217.jpg",300,217,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Tram_4_17_1-1024x741.jpg",960,695,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Tram_4_17_1-1536x1112.jpg",1536,1112,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Tram_4_17_1-2048x1483.jpg",2048,1483,true],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Tram_4_17_1-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Tram_4_17_1-1140x825.jpg",1140,825,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Tram_4_17_1-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Tram_4_17_1-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Tram_4_17_1-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=572&#038;lang=en\" rel=\"category\">TRAM Project progress<\/a>","rttpg_excerpt":"\u2022 At Ethnarhou Makariou street, the construction of the staircase connecting Karaiskaki stop with the underground pedestrian walkway has been completed. \u2022 At Lambraki bridge, the construction of the pedestrian bridge and the widening of the sidewalk are in progress. \u2022 At Grigoriou Lambraki street, the tramway corridor from the Lambraki reversal up to Vas.&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/9096","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=9096"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/9096\/revisions"}],"predecessor-version":[{"id":29033,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/9096\/revisions\/29033"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/9081"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=9096"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=9096"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=9096"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}