{"id":9094,"date":"2017-05-19T13:38:48","date_gmt":"2017-05-19T10:38:48","guid":{"rendered":"https:\/\/www.emetro.gr?p=9094"},"modified":"2024-06-25T13:16:29","modified_gmt":"2024-06-25T10:16:29","slug":"april-2017-2","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=9094&lang=en","title":{"rendered":"April 2017"},"content":{"rendered":"<p>\u2022 NEW RAILWAY Station: The archaeological excavation at the south shafts is complete. The excavation and the temporary retaining of the southern shaft are in progress.<\/p>\n<p>\u2022 DIMOKRATIAS Station: The construction of the temporary retaining at the southern access is in progress.<\/p>\n<p>\u2022 SINTRIVANI Station \u2013 EXPO: The construction of masonry walls at level -1 is in progress.<\/p>\n<p>\u2022 SINTRIVANI Crossover: The backfilling of the roof slab is in progress.<\/p>\n<p>\u2022 PANEPISTIMIO Station: The reinstatement of the surface of the diaphragm walls is in progress.<\/p>\n<p>\u2022 EFKLEIDIS Station: Plastering works at levels -1 and -2, doors installation and painting works at levels -1, -2 and -3 are in progress.<\/p>\n<p>\u2022 FLEMING Station: The temporary retaining of the western access, the excavation and the temporary retaining of the northern and southern shaft and the construction of the masonry walls at levels -1 and -2 are in progress.<\/p>\n<p>\u2022 PATRIKIOU Station and Crossing: Level -2 slab of the crossing has been completed. The excavation of level -3 of the station and the construction of the pile cap beam at the northeast shaft are in progress.<\/p>\n<p>\u2022 VOULGARI Station: Excavation works at level -3 have been completed. The construction of level -3 slab and the excavation and temporary retaining of the eastern ventilation shaft are in progress.<\/p>\n<p>\u2022 NEA ELVETIA Station and Crossover: The works for the construction of the platform have been completed. The construction of perimeter walls at level -1 of the station is in progress.<\/p>\n<p>\u2022 Depot: At Building Complex II, the construction of the roof slab of the washing plant has been completed. The construction of tanks is in progress.<\/p>\n<p>\u2022 TBM Tunnels: The dismantling of TBM 2 has been completed.<\/p>\n<p>The dismantling of the networks in track 1 and the dismantling of TBM 1 are in progress.<\/p>\n<p>\u2022 Cut and Cover Tunnel \u2013 Section I: The construction of the permanent lining is in progress. Section II: The excavation, retaining and construction of the permanent lining are in progress.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u2022 NEW RAILWAY Station: The archaeological excavation at the south shafts is complete. The excavation and the temporary retaining of the southern shaft are in progress. \u2022 DIMOKRATIAS Station: The construction of the temporary retaining at the southern access is in progress. \u2022 SINTRIVANI Station \u2013 EXPO: The construction of masonry walls at level -1 is in progress. \u2022 SINTRIVANI Crossover: The backfilling of the roof slab is in progress. \u2022 PANEPISTIMIO Station: The reinstatement of the surface of the diaphragm walls is in progress. \u2022 EFKLEIDIS Station: Plastering works at levels -1 and -2, doors installation and painting works at levels -1, -2 and -3 are in progress. \u2022 FLEMING Station: The temporary retaining of the western access, the excavation and the temporary retaining of the northern and southern shaft and the construction of the masonry walls at levels -1 and -2 are in progress. \u2022 PATRIKIOU Station and Crossing: Level -2 slab of the crossing has been completed. The excavation of level -3 of the station and the construction of the pile cap beam at the northeast shaft are in progress. \u2022 VOULGARI Station: Excavation works at level -3 have been completed. The construction of level -3 slab and the excavation and temporary retaining of the eastern ventilation shaft are in progress. \u2022 NEA ELVETIA Station and Crossover: The works for the construction of the platform have been completed. The construction of perimeter walls at level -1 of the station is in progress. \u2022 Depot: At Building Complex II, the construction of the roof slab of the washing plant has been completed. The construction of tanks is in progress. \u2022 TBM Tunnels: The dismantling of TBM 2 has been completed. The dismantling of the networks in track 1 and the dismantling of TBM 1 are in progress. \u2022 Cut and Cover Tunnel \u2013 Section I: The construction of the permanent lining is in progress. Section II: The excavation, retaining and construction of the permanent lining are in progress.<\/p>\n","protected":false},"author":4,"featured_media":9084,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[79],"tags":[],"class_list":["post-9094","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-thessaloniki-base-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Thessaloniiki_4_17-scaled.jpg",2560,1920,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Thessaloniiki_4_17-scaled.jpg",2560,1920,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Thessaloniiki_4_17-scaled.jpg",2560,1920,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Thessaloniiki_4_17-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Thessaloniiki_4_17-300x225.jpg",300,225,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Thessaloniiki_4_17-1024x768.jpg",960,720,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Thessaloniiki_4_17-1536x1152.jpg",1536,1152,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Thessaloniiki_4_17-2048x1536.jpg",2048,1536,true],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Thessaloniiki_4_17-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Thessaloniiki_4_17-1140x855.jpg",1140,855,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Thessaloniiki_4_17-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Thessaloniiki_4_17-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Thessaloniiki_4_17-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=79&#038;lang=en\" rel=\"category\">Thessaloniki Base Project progress<\/a>","rttpg_excerpt":"\u2022 NEW RAILWAY Station: The archaeological excavation at the south shafts is complete. The excavation and the temporary retaining of the southern shaft are in progress. \u2022 DIMOKRATIAS Station: The construction of the temporary retaining at the southern access is in progress. \u2022 SINTRIVANI Station \u2013 EXPO: The construction of masonry walls at level -1&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/9094","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=9094"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/9094\/revisions"}],"predecessor-version":[{"id":31021,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/9094\/revisions\/31021"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/9084"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=9094"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=9094"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=9094"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}