{"id":9092,"date":"2017-05-19T13:41:22","date_gmt":"2017-05-19T10:41:22","guid":{"rendered":"https:\/\/www.emetro.gr?p=9092"},"modified":"2024-06-25T13:16:07","modified_gmt":"2024-06-25T10:16:07","slug":"april-2017","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=9092&lang=en","title":{"rendered":"April 2017"},"content":{"rendered":"<p>NOMARCHIA Station: The permanent lining at level -1 has been completed. Works for the construction of the slab at level -2 are in progress.<\/p>\n<p>\u2022 KALAMARIA Station: The construction of the permanent lining at level -3 has been completed. The construction of the slab at level -2 is in progress.<\/p>\n<p>\u2022 ARETSOU Station: Permanent lining and waterproofing of level -3 have been completed. The construction of the slab at level -1 is in progress.<\/p>\n<p>\u2022 NEA KRINI Station: The works for the construction of the northern entrance have been completed.<\/p>\n<p>\u2022 MIKRA Station: Waterproofing and construction works of the perimeter walls at level -2 have been completed. The construction of the slab at level -1 and the platform are in progress.<\/p>\n<p>\u2022 MIKRA Forestation: The construction of the invert at level 6 has been completed.<\/p>\n<p>\u2022 TBM tunnels: The works for the assembly of the first Tunnel Boring Machine are in progress.<\/p>\n<p>\u2022 Design preparation and approval are in progress.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NOMARCHIA Station: The permanent lining at level -1 has been completed. Works for the construction of the slab at level -2 are in progress. \u2022 KALAMARIA Station: The construction of the permanent lining at level -3 has been completed. The construction of the slab at level -2 is in progress. \u2022 ARETSOU Station: Permanent lining and waterproofing of level -3 have been completed. The construction of the slab at level -1 is in progress. \u2022 NEA KRINI Station: The works for the construction of the northern entrance have been completed. \u2022 MIKRA Station: Waterproofing and construction works of the perimeter walls at level -2 have been completed. The construction of the slab at level -1 and the platform are in progress. \u2022 MIKRA Forestation: The construction of the invert at level 6 has been completed. \u2022 TBM tunnels: The works for the assembly of the first Tunnel Boring Machine are in progress. \u2022 Design preparation and approval are in progress.<\/p>\n","protected":false},"author":4,"featured_media":9087,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[544],"tags":[],"class_list":["post-9092","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kalamaria-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Kalamaria_4_17-scaled.jpg",2560,1642,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Kalamaria_4_17-scaled.jpg",2560,1642,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Kalamaria_4_17-scaled.jpg",2560,1642,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Kalamaria_4_17-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Kalamaria_4_17-300x192.jpg",300,192,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Kalamaria_4_17-1024x657.jpg",960,616,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Kalamaria_4_17-1536x985.jpg",1536,985,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Kalamaria_4_17-2048x1313.jpg",2048,1313,true],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Kalamaria_4_17-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Kalamaria_4_17-1140x731.jpg",1140,731,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Kalamaria_4_17-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Kalamaria_4_17-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2017\/05\/Kalamaria_4_17-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=544&#038;lang=en\" rel=\"category\">Kalamaria Project progress<\/a>","rttpg_excerpt":"NOMARCHIA Station: The permanent lining at level -1 has been completed. Works for the construction of the slab at level -2 are in progress. \u2022 KALAMARIA Station: The construction of the permanent lining at level -3 has been completed. The construction of the slab at level -2 is in progress. \u2022 ARETSOU Station: Permanent lining&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/9092","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=9092"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/9092\/revisions"}],"predecessor-version":[{"id":29023,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/9092\/revisions\/29023"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/9087"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=9092"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=9092"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=9092"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}