{"id":5956,"date":"2013-11-11T07:17:24","date_gmt":"2013-11-11T05:17:24","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=5956&#038;lang=en"},"modified":"2024-06-27T12:48:59","modified_gmt":"2024-06-27T09:48:59","slug":"september-2013-3","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=5956&lang=en","title":{"rendered":"September 2013"},"content":{"rendered":"<ul>\n<li style=\"text-align: justify;\">The topographical works along the Tramway Extension to Piraeus are in progress;<\/li>\n<li style=\"text-align: justify;\">The investigation trenches related works in roads and sidewalks along the Project, for the identification of archaeological finds and PUO networks, are in progress;<\/li>\n<li style=\"text-align: justify;\">The Contractor has been installed in the land plot of Palaio Faliro Municipality in the area of Rizareios and the works for the configuration of a children\u2019s garden have commenced. The works in the Tramway Depot Building facilities in ELLINIKO, where re-configuration of the areas and relevant repairs are in progress, have commenced.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The topographical works along the Tramway Extension to Piraeus are in progress; The investigation trenches related works in roads and sidewalks along the Project, for the identification of archaeological finds and PUO networks, are in progress; The Contractor has been installed in the land plot of Palaio Faliro Municipality in the area of Rizareios and the works for the configuration of a children\u2019s garden have commenced. The works in the Tramway Depot Building facilities in ELLINIKO, where re-configuration of the areas and relevant repairs are in progress, have commenced.<\/p>\n","protected":false},"author":9,"featured_media":3831,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[572],"tags":[],"class_list":["post-5956","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tram-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Sept13_LG.jpg",553,415,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Sept13_LG.jpg",553,415,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Sept13_LG.jpg",553,415,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Sept13_LG-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Sept13_LG-300x225.jpg",300,225,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Sept13_LG.jpg",553,415,false],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Sept13_LG.jpg",553,415,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Sept13_LG.jpg",553,415,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Sept13_LG.jpg",553,415,false],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Sept13_LG.jpg",553,415,false],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Sept13_LG-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Sept13_LG-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Sept13_LG-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"elinaki","author_link":"https:\/\/www.emetro.gr\/?author=9"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=572&#038;lang=en\" rel=\"category\">TRAM Project progress<\/a>","rttpg_excerpt":"The topographical works along the Tramway Extension to Piraeus are in progress; The investigation trenches related works in roads and sidewalks along the Project, for the identification of archaeological finds and PUO networks, are in progress; The Contractor has been installed in the land plot of Palaio Faliro Municipality in the area of Rizareios and&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5956","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5956"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5956\/revisions"}],"predecessor-version":[{"id":29039,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5956\/revisions\/29039"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/3831"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5956"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5956"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5956"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}