{"id":5952,"date":"2014-01-13T07:14:58","date_gmt":"2014-01-13T05:14:58","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=5952&#038;lang=en"},"modified":"2024-06-25T14:56:52","modified_gmt":"2024-06-25T11:56:52","slug":"november-2013-3","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=5952&lang=en","title":{"rendered":"November 2013"},"content":{"rendered":"<ul>\n<li style=\"text-align: justify;\">The topographical survey works in roads and sidewalks along the Tramway Extension to Piraeus are at an advanced stage;<\/li>\n<li style=\"text-align: justify;\">Architectural finishes and electromechanical works at Building No. 2 are in progress, while the dismantling works in the areas of Building No. 1 to be re-configured in the Tramway Depot Building facilities in ELLINIKO have commenced;<\/li>\n<li style=\"text-align: justify;\">Cleaning works in the land plot of the playground in the area of Rizareios \u2013 P. Faliro have been completed; while the works related to the W.C. building complex have commenced.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The topographical survey works in roads and sidewalks along the Tramway Extension to Piraeus are at an advanced stage; Architectural finishes and electromechanical works at Building No. 2 are in progress, while the dismantling works in the areas of Building No. 1 to be re-configured in the Tramway Depot Building facilities in ELLINIKO have commenced; Cleaning works in the land plot of the playground in the area of Rizareios \u2013 P. Faliro have been completed; while the works related to the W.C. building complex have commenced.<\/p>\n","protected":false},"author":9,"featured_media":3825,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[572],"tags":[],"class_list":["post-5952","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tram-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Nov13_LG.jpg",620,465,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Nov13_LG.jpg",620,465,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Nov13_LG.jpg",620,465,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Nov13_LG-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Nov13_LG-300x225.jpg",300,225,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Nov13_LG.jpg",620,465,false],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Nov13_LG.jpg",620,465,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Nov13_LG.jpg",620,465,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Nov13_LG.jpg",620,465,false],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Nov13_LG.jpg",620,465,false],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Nov13_LG-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Nov13_LG-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Nov13_LG-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"elinaki","author_link":"https:\/\/www.emetro.gr\/?author=9"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=572&#038;lang=en\" rel=\"category\">TRAM Project progress<\/a>","rttpg_excerpt":"The topographical survey works in roads and sidewalks along the Tramway Extension to Piraeus are at an advanced stage; Architectural finishes and electromechanical works at Building No. 2 are in progress, while the dismantling works in the areas of Building No. 1 to be re-configured in the Tramway Depot Building facilities in ELLINIKO have commenced;&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5952","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5952"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5952\/revisions"}],"predecessor-version":[{"id":29037,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5952\/revisions\/29037"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/3825"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5952"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5952"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5952"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}