{"id":5944,"date":"2014-04-09T07:10:52","date_gmt":"2014-04-09T04:10:52","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=5944&#038;lang=en"},"modified":"2024-05-28T13:38:15","modified_gmt":"2024-05-28T10:38:15","slug":"march-2014-3","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=5944&lang=en","title":{"rendered":"March 2014"},"content":{"rendered":"<ul>\n<li style=\"text-align: justify;\">Traffic arrangements (Phase B\u2019) were implemented in district A\u2019 of Piraeus Municipality (Piraiki area), while the reinstatement of traffic islands, stripings etc. is in progress;<\/li>\n<li style=\"text-align: justify;\">The delimitation of individual worksite areas is in progress, while the following works are about to commence, namely the configuration of Lambraki Ave. U-turn, of sidewalks at Lambraki Ave. and of the area where Karaiskaki Tramway stop shall be constructed;<\/li>\n<li style=\"text-align: justify;\">The works for the relocation of trolley-bus lines (lines 16 and 17) are at the completion phase, while the works for the relocation of trolley-bus line 20 and of all trolley-bus lines outside the Piraeus Tramway extension path are scheduled to commence immediately;<\/li>\n<li style=\"text-align: justify;\">Works have been completed at Elliniko Tramway Depot building installations, the E\/M installations are at the testing phase in building 2, while the works for the re-arrangement of building 1 room areas are in progress;<\/li>\n<li style=\"text-align: justify;\">In the children playground area at Rizarios \u2013 Palaio Faliro, the WC buildings, the construction of the landplot fencing and the configuration of the surrounding area are at the completion phase.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Traffic arrangements (Phase B\u2019) were implemented in district A\u2019 of Piraeus Municipality (Piraiki area), while the reinstatement of traffic islands, stripings etc. is in progress; The delimitation of individual worksite areas is in progress, while the following works are about to commence, namely the configuration of Lambraki Ave. U-turn, of sidewalks at Lambraki Ave. and of the area where Karaiskaki Tramway stop shall be constructed; The works for the relocation of trolley-bus lines (lines 16 and 17) are at the completion phase, while the works for the relocation of trolley-bus line 20 and of all trolley-bus lines outside the Piraeus Tramway extension path are scheduled to commence immediately; Works have been completed at Elliniko Tramway Depot building installations, the E\/M installations are at the testing phase in building 2, while the works for the re-arrangement of building 1 room areas are in progress; In the children playground area at Rizarios \u2013 Palaio Faliro, the WC buildings, the construction of the landplot fencing and the configuration of the surrounding area are at the completion phase.<\/p>\n","protected":false},"author":9,"featured_media":3813,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[572],"tags":[],"class_list":["post-5944","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tram-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Mar14_LG.jpg",576,768,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Mar14_LG.jpg",576,768,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Mar14_LG.jpg",576,768,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Mar14_LG-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Mar14_LG-225x300.jpg",225,300,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Mar14_LG.jpg",576,768,false],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Mar14_LG.jpg",576,768,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Mar14_LG.jpg",576,768,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Mar14_LG-576x540.jpg",576,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Mar14_LG.jpg",576,768,false],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Mar14_LG-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Mar14_LG-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_TRAM_progress_Mar14_LG-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"elinaki","author_link":"https:\/\/www.emetro.gr\/?author=9"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=572&#038;lang=en\" rel=\"category\">TRAM Project progress<\/a>","rttpg_excerpt":"Traffic arrangements (Phase B\u2019) were implemented in district A\u2019 of Piraeus Municipality (Piraiki area), while the reinstatement of traffic islands, stripings etc. is in progress; The delimitation of individual worksite areas is in progress, while the following works are about to commence, namely the configuration of Lambraki Ave. U-turn, of sidewalks at Lambraki Ave. and&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5944","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5944"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5944\/revisions"}],"predecessor-version":[{"id":28231,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5944\/revisions\/28231"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/3813"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5944"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5944"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5944"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}