{"id":5881,"date":"2014-05-07T05:53:43","date_gmt":"2014-05-07T02:53:43","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=5881&#038;lang=en"},"modified":"2024-05-28T13:28:24","modified_gmt":"2024-05-28T10:28:24","slug":"april-2014-3","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=5881&lang=en","title":{"rendered":"April 2014"},"content":{"rendered":"<ul>\n<li style=\"text-align: justify;\">Piles constructed and excavations performed at the TBM start-up shaft at Micra;<\/li>\n<li style=\"text-align: justify;\">The Supplementary Geotechnical Survey was completed concerning all locations of the Project;<\/li>\n<li style=\"text-align: justify;\">The preparation of designs for the PUO networks relocation and diversion, the designs concerning traffic arrangements \u2013 diversions and the final designs are in progress at various locations of the Project at Kalamaria extension;<\/li>\n<li style=\"text-align: justify;\">Topographical works and works for the inventory of buildings and structures within the project influence zone are in progress.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Piles constructed and excavations performed at the TBM start-up shaft at Micra; The Supplementary Geotechnical Survey was completed concerning all locations of the Project; The preparation of designs for the PUO networks relocation and diversion, the designs concerning traffic arrangements \u2013 diversions and the final designs are in progress at various locations of the Project at Kalamaria extension; Topographical works and works for the inventory of buildings and structures within the project influence zone are in progress.<\/p>\n","protected":false},"author":9,"featured_media":3725,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[544],"tags":[],"class_list":["post-5881","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kalamaria-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Apr14_LG.jpg",1024,768,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Apr14_LG.jpg",1024,768,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Apr14_LG.jpg",1024,768,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Apr14_LG-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Apr14_LG-300x225.jpg",300,225,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Apr14_LG.jpg",960,720,false],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Apr14_LG.jpg",1024,768,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Apr14_LG.jpg",1024,768,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Apr14_LG-1024x540.jpg",1024,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Apr14_LG.jpg",1024,768,false],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Apr14_LG-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Apr14_LG-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Apr14_LG-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"elinaki","author_link":"https:\/\/www.emetro.gr\/?author=9"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=544&#038;lang=en\" rel=\"category\">Kalamaria Project progress<\/a>","rttpg_excerpt":"Piles constructed and excavations performed at the TBM start-up shaft at Micra; The Supplementary Geotechnical Survey was completed concerning all locations of the Project; The preparation of designs for the PUO networks relocation and diversion, the designs concerning traffic arrangements \u2013 diversions and the final designs are in progress at various locations of the Project&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5881","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5881"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5881\/revisions"}],"predecessor-version":[{"id":28228,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5881\/revisions\/28228"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/3725"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5881"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5881"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5881"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}