{"id":5865,"date":"2015-01-13T05:45:15","date_gmt":"2015-01-13T03:45:15","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=5865&#038;lang=en"},"modified":"2024-05-28T13:28:24","modified_gmt":"2024-05-28T10:28:24","slug":"december-2014-3","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=5865&lang=en","title":{"rendered":"December 2014"},"content":{"rendered":"<ul>\n<li style=\"text-align: justify;\">NOMARCHIA Station &amp; Crossover: The works concerning the diversion of the sewage pipe through micro-TBM underground boring have been completed. The works for the diversion of traffic from Mitropoliti Kydonion Grigoriou street into a new street within the area of the former Farmaki camp, as well as the PUO network diversion works, are in progress;<\/li>\n<li style=\"text-align: justify;\">KALAMARIA Station: The works for the diversion of PUO networks are in progress, while traffic arrangement works have commenced;<\/li>\n<li style=\"text-align: justify;\">NEA KRINI Station: The construction of the Station\u2019s pile retaining system, as well as the excavation of a section of the Station at a depth of approximately 9m are in progress;<\/li>\n<li style=\"text-align: justify;\">MIKRA Station: The construction of the Station\u2019s temporary retaining system (prestressed anchors, shotcrete), as well as worksite installation works networks are in progress;<\/li>\n<li style=\"text-align: justify;\">The preparation of designs is in progress;<\/li>\n<li style=\"text-align: justify;\">The expropriation of ARETSOU, NEA KRINI Station areas and the area of MIKRA forestation is still pending.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>NOMARCHIA Station &amp; Crossover: The works concerning the diversion of the sewage pipe through micro-TBM underground boring have been completed. The works for the diversion of traffic from Mitropoliti Kydonion Grigoriou street into a new street within the area of the former Farmaki camp, as well as the PUO network diversion works, are in progress; KALAMARIA Station: The works for the diversion of PUO networks are in progress, while traffic arrangement works have commenced; NEA KRINI Station: The construction of the Station\u2019s pile retaining system, as well as the excavation of a section of the Station at a depth of approximately 9m are in progress; MIKRA Station: The construction of the Station\u2019s temporary retaining system (prestressed anchors, shotcrete), as well as worksite installation works networks are in progress; The preparation of designs is in progress; The expropriation of ARETSOU, NEA KRINI Station areas and the area of MIKRA forestation is still pending.<\/p>\n","protected":false},"author":9,"featured_media":3701,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[544],"tags":[],"class_list":["post-5865","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kalamaria-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Dec14_LG.jpg",1024,682,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Dec14_LG.jpg",1024,682,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Dec14_LG.jpg",1024,682,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Dec14_LG-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Dec14_LG-300x200.jpg",300,200,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Dec14_LG.jpg",960,639,false],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Dec14_LG.jpg",1024,682,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Dec14_LG.jpg",1024,682,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Dec14_LG-1024x540.jpg",1024,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Dec14_LG.jpg",1024,682,false],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Dec14_LG-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Dec14_LG-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Dec14_LG-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"elinaki","author_link":"https:\/\/www.emetro.gr\/?author=9"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=544&#038;lang=en\" rel=\"category\">Kalamaria Project progress<\/a>","rttpg_excerpt":"NOMARCHIA Station &amp; Crossover: The works concerning the diversion of the sewage pipe through micro-TBM underground boring have been completed. The works for the diversion of traffic from Mitropoliti Kydonion Grigoriou street into a new street within the area of the former Farmaki camp, as well as the PUO network diversion works, are in progress;&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5865","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5865"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5865\/revisions"}],"predecessor-version":[{"id":28180,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5865\/revisions\/28180"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/3701"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5865"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5865"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5865"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}