{"id":5853,"date":"2015-07-13T05:38:17","date_gmt":"2015-07-13T02:38:17","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=5853&#038;lang=en"},"modified":"2024-05-28T13:28:24","modified_gmt":"2024-05-28T10:28:24","slug":"june-2015-3","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=5853&lang=en","title":{"rendered":"June 2015"},"content":{"rendered":"<ul>\n<li style=\"text-align: justify;\">NOMARCHIA Station and Crossover: The works for the construction of temporary retaining piles are at an advanced stage;<\/li>\n<li style=\"text-align: justify;\">KALAMARIA Station: Works for the construction of temporary retaining piles are in progress;<\/li>\n<li style=\"text-align: justify;\">NEA KRINI Station: Works for the retaining of the station are in progress (installation of struts at the 2nd level);<\/li>\n<li style=\"text-align: justify;\">MIKRA Station: The works for the construction of the temporary retaining system (pre-stressed anchors, bored piles) are at a completion stage, while works for the construction of the NATM tunnel are at an advanced stage;<\/li>\n<li style=\"text-align: justify;\">KRITI Shaft: The construction of temporary retaining piles was completed, while excavation works have commenced;<\/li>\n<li style=\"text-align: justify;\">Preparation and approval of designs are in progress;<\/li>\n<li style=\"text-align: justify;\">The expropriation of areas at ARETSOU Station, MIKRA Station portion and MIKRA Forestation is still pending.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>NOMARCHIA Station and Crossover: The works for the construction of temporary retaining piles are at an advanced stage; KALAMARIA Station: Works for the construction of temporary retaining piles are in progress; NEA KRINI Station: Works for the retaining of the station are in progress (installation of struts at the 2nd level); MIKRA Station: The works for the construction of the temporary retaining system (pre-stressed anchors, bored piles) are at a completion stage, while works for the construction of the NATM tunnel are at an advanced stage; KRITI Shaft: The construction of temporary retaining piles was completed, while excavation works have commenced; Preparation and approval of designs are in progress; The expropriation of areas at ARETSOU Station, MIKRA Station portion and MIKRA Forestation is still pending.<\/p>\n","protected":false},"author":9,"featured_media":3683,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[544],"tags":[],"class_list":["post-5853","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kalamaria-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Jun15_LG.jpg",1024,441,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Jun15_LG.jpg",1024,441,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Jun15_LG.jpg",1024,441,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Jun15_LG-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Jun15_LG-300x129.jpg",300,129,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Jun15_LG.jpg",960,413,false],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Jun15_LG.jpg",1024,441,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Jun15_LG.jpg",1024,441,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Jun15_LG.jpg",1024,441,false],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Jun15_LG.jpg",1024,441,false],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Jun15_LG-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Jun15_LG-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Jun15_LG-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"elinaki","author_link":"https:\/\/www.emetro.gr\/?author=9"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=544&#038;lang=en\" rel=\"category\">Kalamaria Project progress<\/a>","rttpg_excerpt":"NOMARCHIA Station and Crossover: The works for the construction of temporary retaining piles are at an advanced stage; KALAMARIA Station: Works for the construction of temporary retaining piles are in progress; NEA KRINI Station: Works for the retaining of the station are in progress (installation of struts at the 2nd level); MIKRA Station: The works&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5853","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5853"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5853\/revisions"}],"predecessor-version":[{"id":28147,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5853\/revisions\/28147"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/3683"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5853"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5853"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5853"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}