{"id":5845,"date":"2015-11-23T05:29:50","date_gmt":"2015-11-23T03:29:50","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=5845&#038;lang=en"},"modified":"2024-05-28T13:28:23","modified_gmt":"2024-05-28T10:28:23","slug":"october-2015-3","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=5845&lang=en","title":{"rendered":"October 2015"},"content":{"rendered":"<ul>\n<li style=\"text-align: justify;\">NOMARCHIA Station: Works for the phase A excavation, the construction of struts at level -1 and the perimeter piles cap beam are in progress;<\/li>\n<li style=\"text-align: justify;\">NOMARCHIA Crossover: Works for the construction of perimeter retaining piles and their cap beam, as well as works for the diversion of PUO networks are in progress;<\/li>\n<li style=\"text-align: justify;\">KALAMARIA Station: Works for the construction of perimeter piles at the eastern section of the station, as well as works for the diversion of PUO networks are in progress;<\/li>\n<li style=\"text-align: justify;\">ARETSOU Station: The works for the construction of perimeter piles at a part of the station are in progress;<\/li>\n<li style=\"text-align: justify;\">NEA KRINI Station: Works for the construction of a pumping station on the station raft, works for the construction of perimeter walls at level -3 and works for the removal of the 2nd row of struts, are in progress;<\/li>\n<li style=\"text-align: justify;\">MIKRA Station: The boring of the 1st and 2nd NATM tunnel is completed;<\/li>\n<li style=\"text-align: justify;\">MIKRA 2nd Crossover: Works for the construction of perimeter retaining piles and their cap beam are in progress;<\/li>\n<li style=\"text-align: justify;\">MIKRA Forestation: Works for the diversion of PUO networks are in progress;<\/li>\n<li style=\"text-align: justify;\">Terminal Shaft: The construction of perimeter piles is in progress;<\/li>\n<li style=\"text-align: justify;\">Kritis shaft: The excavation of the 1st phase and the preparatory works for the installation of the 1st level metal struts is in progress;<\/li>\n<li style=\"text-align: justify;\">Pontou shaft: The construction of perimeter piles and the configuration of the worksite area are in progress;<\/li>\n<li style=\"text-align: justify;\">Preparation and approval of designs: in progress;<\/li>\n<li style=\"text-align: justify;\">Areas expropriation at ARETSOU Station, MIKRA Station and MIKRA Forestation is still pending.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>NOMARCHIA Station: Works for the phase A excavation, the construction of struts at level -1 and the perimeter piles cap beam are in progress; NOMARCHIA Crossover: Works for the construction of perimeter retaining piles and their cap beam, as well as works for the diversion of PUO networks are in progress; KALAMARIA Station: Works for the construction of perimeter piles at the eastern section of the station, as well as works for the diversion of PUO networks are in progress; ARETSOU Station: The works for the construction of perimeter piles at a part of the station are in progress; NEA KRINI Station: Works for the construction of a pumping station on the station raft, works for the construction of perimeter walls at level -3 and works for the removal of the 2nd row of struts, are in progress; MIKRA Station: The boring of the 1st and 2nd NATM tunnel is completed; MIKRA 2nd Crossover: Works for the construction of perimeter retaining piles and their cap beam are in progress; MIKRA Forestation: Works for the diversion of PUO networks are in progress; Terminal Shaft: The construction of perimeter piles is in progress; Kritis shaft: The excavation of the 1st phase and the preparatory works for the installation of the 1st level metal struts is in progress; Pontou shaft: The construction of perimeter piles and the configuration of the worksite area are in progress; Preparation and approval of designs: in progress; Areas expropriation at ARETSOU Station, MIKRA Station and MIKRA Forestation is still pending.<\/p>\n","protected":false},"author":9,"featured_media":3671,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[544],"tags":[],"class_list":["post-5845","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kalamaria-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Oct15_LG.jpg",1024,768,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Oct15_LG.jpg",1024,768,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Oct15_LG.jpg",1024,768,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Oct15_LG-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Oct15_LG-300x225.jpg",300,225,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Oct15_LG.jpg",960,720,false],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Oct15_LG.jpg",1024,768,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Oct15_LG.jpg",1024,768,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Oct15_LG-1024x540.jpg",1024,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Oct15_LG.jpg",1024,768,false],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Oct15_LG-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Oct15_LG-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Kalamaria_progress_Oct15_LG-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"elinaki","author_link":"https:\/\/www.emetro.gr\/?author=9"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=544&#038;lang=en\" rel=\"category\">Kalamaria Project progress<\/a>","rttpg_excerpt":"NOMARCHIA Station: Works for the phase A excavation, the construction of struts at level -1 and the perimeter piles cap beam are in progress; NOMARCHIA Crossover: Works for the construction of perimeter retaining piles and their cap beam, as well as works for the diversion of PUO networks are in progress; KALAMARIA Station: Works for&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5845","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5845"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5845\/revisions"}],"predecessor-version":[{"id":28131,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5845\/revisions\/28131"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/3671"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5845"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5845"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5845"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}