{"id":5816,"date":"2008-05-04T12:16:43","date_gmt":"2008-05-04T09:16:43","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=5816&#038;lang=en"},"modified":"2024-07-03T11:35:04","modified_gmt":"2024-07-03T08:35:04","slug":"april-2008","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=5816&lang=en","title":{"rendered":"April 2008"},"content":{"rendered":"<ul>\n<li style=\"text-align: justify;\">The second Tunnel Boring Machine arrived in Thessaloniki.<\/li>\n<li style=\"text-align: justify;\">Diaphragm walls at VENIZELOU Station were completed and works related to the installation of the metal bridge at the street level commenced.<\/li>\n<li style=\"text-align: justify;\">Works related to the excavation of the forestation at NEOS SIDIRODROMIKOS STATHMOS commenced.<\/li>\n<li style=\"text-align: justify;\">The excavation of the start-up shaft of the tunnel boring machine in the area of NEOS SIDIRODROMIKOS STATHMOS is at a completion stage.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The second Tunnel Boring Machine arrived in Thessaloniki. Diaphragm walls at VENIZELOU Station were completed and works related to the installation of the metal bridge at the street level commenced. Works related to the excavation of the forestation at NEOS SIDIRODROMIKOS STATHMOS commenced. The excavation of the start-up shaft of the tunnel boring machine in the area of NEOS SIDIRODROMIKOS STATHMOS is at a completion stage.<\/p>\n","protected":false},"author":9,"featured_media":3600,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[79],"tags":[],"class_list":["post-5816","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-thessaloniki-base-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_apr08_LG.jpg",1000,664,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_apr08_LG.jpg",1000,664,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_apr08_LG.jpg",1000,664,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_apr08_LG-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_apr08_LG-300x199.jpg",300,199,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_apr08_LG.jpg",960,637,false],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_apr08_LG.jpg",1000,664,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_apr08_LG.jpg",1000,664,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_apr08_LG-1000x540.jpg",1000,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_apr08_LG.jpg",1000,664,false],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_apr08_LG-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_apr08_LG-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_apr08_LG-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"elinaki","author_link":"https:\/\/www.emetro.gr\/?author=9"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=79&#038;lang=en\" rel=\"category\">Thessaloniki Base Project progress<\/a>","rttpg_excerpt":"The second Tunnel Boring Machine arrived in Thessaloniki. Diaphragm walls at VENIZELOU Station were completed and works related to the installation of the metal bridge at the street level commenced. Works related to the excavation of the forestation at NEOS SIDIRODROMIKOS STATHMOS commenced. The excavation of the start-up shaft of the tunnel boring machine in&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5816","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5816"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5816\/revisions"}],"predecessor-version":[{"id":31373,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5816\/revisions\/31373"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/3600"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5816"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5816"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5816"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}