{"id":5771,"date":"2009-06-05T11:39:34","date_gmt":"2009-06-05T08:39:34","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=5771&#038;lang=en"},"modified":"2024-07-03T10:59:49","modified_gmt":"2024-07-03T07:59:49","slug":"%ce%bcay-2009","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=5771&lang=en","title":{"rendered":"\u039cay 2009"},"content":{"rendered":"<ul>\n<li style=\"text-align: justify;\">The first TBM (\u03a4\u0392\u039c 1) has bored 800m. of tunnel, while the second one (\u03a4\u0392\u039c 2) has constructed 200m. of parallel tunnel.<\/li>\n<li style=\"text-align: justify;\">The construction of diaphragm walls at NEO SIDIRODROMIKO STATHMO was completed, while at an advanced stage is the construction of diaphragm walls at AGHIA SOFIA Station (66%).<\/li>\n<li style=\"text-align: justify;\">Works related to the construction of new facilities of the 1st Laboratory of Special Professional Training in Thessaloniki\u00a0 were completed in the in the area where the orphanage &#8220;Alexander the Great&#8221; was located in order make possible the commencement of works related to the construction of PAPAFI station.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The first TBM (\u03a4\u0392\u039c 1) has bored 800m. of tunnel, while the second one (\u03a4\u0392\u039c 2) has constructed 200m. of parallel tunnel. The construction of diaphragm walls at NEO SIDIRODROMIKO STATHMO was completed, while at an advanced stage is the construction of diaphragm walls at AGHIA SOFIA Station (66%). Works related to the construction of new facilities of the 1st Laboratory of Special Professional Training in Thessaloniki\u00a0 were completed in the in the area where the orphanage &#8220;Alexander the Great&#8221; was located in order make possible the commencement of works related to the construction of PAPAFI station.<\/p>\n","protected":false},"author":9,"featured_media":3561,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[79],"tags":[],"class_list":["post-5771","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-thessaloniki-base-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_NSS_progress_may09_LG.jpg",656,800,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_NSS_progress_may09_LG.jpg",656,800,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_NSS_progress_may09_LG.jpg",656,800,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_NSS_progress_may09_LG-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_NSS_progress_may09_LG-246x300.jpg",246,300,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_NSS_progress_may09_LG.jpg",656,800,false],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_NSS_progress_may09_LG.jpg",656,800,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_NSS_progress_may09_LG.jpg",656,800,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_NSS_progress_may09_LG-656x540.jpg",656,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_NSS_progress_may09_LG.jpg",656,800,false],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_NSS_progress_may09_LG-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_NSS_progress_may09_LG-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_NSS_progress_may09_LG-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"elinaki","author_link":"https:\/\/www.emetro.gr\/?author=9"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=79&#038;lang=en\" rel=\"category\">Thessaloniki Base Project progress<\/a>","rttpg_excerpt":"The first TBM (\u03a4\u0392\u039c 1) has bored 800m. of tunnel, while the second one (\u03a4\u0392\u039c 2) has constructed 200m. of parallel tunnel. The construction of diaphragm walls at NEO SIDIRODROMIKO STATHMO was completed, while at an advanced stage is the construction of diaphragm walls at AGHIA SOFIA Station (66%). Works related to the construction of&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5771","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5771"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5771\/revisions"}],"predecessor-version":[{"id":31320,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5771\/revisions\/31320"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/3561"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5771"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5771"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5771"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}