{"id":5688,"date":"2012-08-27T10:56:06","date_gmt":"2012-08-27T07:56:06","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=5688&#038;lang=en"},"modified":"2024-06-28T14:54:08","modified_gmt":"2024-06-28T11:54:08","slug":"july-2012-2","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=5688&lang=en","title":{"rendered":"July 2012"},"content":{"rendered":"<ul>\n<li style=\"text-align: justify;\">The construction of inner parapet walls at EFKLIDIS Station is in progress.<\/li>\n<li style=\"text-align: justify;\">The excavation works at FLEMING Station are in progress.<\/li>\n<li style=\"text-align: justify;\">The construction of diaphragm walls at ANALIPSI Station is in progress.<\/li>\n<li style=\"text-align: justify;\">The ground slab at the 2nd basement of PANEPISTIMIO Station has been completed.<\/li>\n<li style=\"text-align: justify;\">The construction of the roof slab at the intersection of DIMOKRATIAS Station has been completed.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The construction of inner parapet walls at EFKLIDIS Station is in progress. The excavation works at FLEMING Station are in progress. The construction of diaphragm walls at ANALIPSI Station is in progress. The ground slab at the 2nd basement of PANEPISTIMIO Station has been completed. The construction of the roof slab at the intersection of DIMOKRATIAS Station has been completed.<\/p>\n","protected":false},"author":9,"featured_media":3447,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[79],"tags":[],"class_list":["post-5688","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-thessaloniki-base-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_July12_LG.jpg",800,533,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_July12_LG.jpg",800,533,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_July12_LG.jpg",800,533,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_July12_LG-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_July12_LG-300x200.jpg",300,200,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_July12_LG.jpg",800,533,false],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_July12_LG.jpg",800,533,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_July12_LG.jpg",800,533,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_July12_LG.jpg",800,533,false],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_July12_LG.jpg",800,533,false],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_July12_LG-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_July12_LG-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_July12_LG-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"elinaki","author_link":"https:\/\/www.emetro.gr\/?author=9"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=79&#038;lang=en\" rel=\"category\">Thessaloniki Base Project progress<\/a>","rttpg_excerpt":"The construction of inner parapet walls at EFKLIDIS Station is in progress. The excavation works at FLEMING Station are in progress. The construction of diaphragm walls at ANALIPSI Station is in progress. The ground slab at the 2nd basement of PANEPISTIMIO Station has been completed. The construction of the roof slab at the intersection of&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5688","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5688"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5688\/revisions"}],"predecessor-version":[{"id":31142,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5688\/revisions\/31142"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/3447"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5688"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5688"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5688"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}