{"id":5659,"date":"2013-09-05T09:43:08","date_gmt":"2013-09-05T06:43:08","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=5659&#038;lang=en"},"modified":"2024-06-27T12:53:54","modified_gmt":"2024-06-27T09:53:54","slug":"august-2013-2","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=5659&lang=en","title":{"rendered":"August 2013"},"content":{"rendered":"<ul>\n<li style=\"text-align: justify;\">The concreting works of the slab at -1 level at DIMOKRATIAS Station are in progress.<\/li>\n<li style=\"text-align: justify;\">The works for changing the traffic arrangements in AGHIA SOFIA Station are at the completion stage.<\/li>\n<li style=\"text-align: justify;\">The roof slab backfilling works are in progress, while the excavation at the north-western shaft at SINTRIVANI Station is completed.<\/li>\n<li style=\"text-align: justify;\">The works for the construction of diaphragm walls and the construction of bored-piles at PAPAFI Station are in progress.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The concreting works of the slab at -1 level at DIMOKRATIAS Station are in progress. The works for changing the traffic arrangements in AGHIA SOFIA Station are at the completion stage. The roof slab backfilling works are in progress, while the excavation at the north-western shaft at SINTRIVANI Station is completed. The works for the construction of diaphragm walls and the construction of bored-piles at PAPAFI Station are in progress.<\/p>\n","protected":false},"author":9,"featured_media":3408,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[79],"tags":[],"class_list":["post-5659","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-thessaloniki-base-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Aug13_LG.jpg",1024,768,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Aug13_LG.jpg",1024,768,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Aug13_LG.jpg",1024,768,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Aug13_LG-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Aug13_LG-300x225.jpg",300,225,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Aug13_LG.jpg",960,720,false],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Aug13_LG.jpg",1024,768,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Aug13_LG.jpg",1024,768,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Aug13_LG-1024x540.jpg",1024,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Aug13_LG.jpg",1024,768,false],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Aug13_LG-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Aug13_LG-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Aug13_LG-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"elinaki","author_link":"https:\/\/www.emetro.gr\/?author=9"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=79&#038;lang=en\" rel=\"category\">Thessaloniki Base Project progress<\/a>","rttpg_excerpt":"The concreting works of the slab at -1 level at DIMOKRATIAS Station are in progress. The works for changing the traffic arrangements in AGHIA SOFIA Station are at the completion stage. The roof slab backfilling works are in progress, while the excavation at the north-western shaft at SINTRIVANI Station is completed. The works for the&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5659","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5659"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5659\/revisions"}],"predecessor-version":[{"id":31071,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5659\/revisions\/31071"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/3408"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5659"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5659"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5659"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}