{"id":5657,"date":"2013-10-08T09:39:46","date_gmt":"2013-10-08T06:39:46","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=5657&#038;lang=en"},"modified":"2024-06-27T12:51:57","modified_gmt":"2024-06-27T09:51:57","slug":"september-2013-2","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=5657&lang=en","title":{"rendered":"September 2013"},"content":{"rendered":"<ul>\n<li style=\"text-align: justify;\">The works for the relocation of the PUO networks in the area of AGHIA SOFIA Station are in progress;<\/li>\n<li style=\"text-align: justify;\">The excavation works up to level -2, as well as the works for the construction of the ventilation gallery in SINTRIVANIStation are in progress;<\/li>\n<li style=\"text-align: justify;\">The waterproofing works of the accesses in PANEPISTIMIO Station are in progress;<\/li>\n<li style=\"text-align: justify;\">The waterproofing works and the works for the construction of the invert slab of the eastern access in FLEMING Station are in progress.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The works for the relocation of the PUO networks in the area of AGHIA SOFIA Station are in progress; The excavation works up to level -2, as well as the works for the construction of the ventilation gallery in SINTRIVANIStation are in progress; The waterproofing works of the accesses in PANEPISTIMIO Station are in progress; The waterproofing works and the works for the construction of the invert slab of the eastern access in FLEMING Station are in progress.<\/p>\n","protected":false},"author":9,"featured_media":3405,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[79],"tags":[],"class_list":["post-5657","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-thessaloniki-base-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Sept13_LG.jpg",576,768,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Sept13_LG.jpg",576,768,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Sept13_LG.jpg",576,768,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Sept13_LG-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Sept13_LG-225x300.jpg",225,300,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Sept13_LG.jpg",576,768,false],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Sept13_LG.jpg",576,768,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Sept13_LG.jpg",576,768,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Sept13_LG-576x540.jpg",576,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Sept13_LG.jpg",576,768,false],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Sept13_LG-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Sept13_LG-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Sept13_LG-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"elinaki","author_link":"https:\/\/www.emetro.gr\/?author=9"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=79&#038;lang=en\" rel=\"category\">Thessaloniki Base Project progress<\/a>","rttpg_excerpt":"The works for the relocation of the PUO networks in the area of AGHIA SOFIA Station are in progress; The excavation works up to level -2, as well as the works for the construction of the ventilation gallery in SINTRIVANIStation are in progress; The waterproofing works of the accesses in PANEPISTIMIO Station are in progress;&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5657","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5657"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5657\/revisions"}],"predecessor-version":[{"id":31068,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5657\/revisions\/31068"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/3405"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5657"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5657"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5657"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}