{"id":5649,"date":"2014-02-04T09:34:16","date_gmt":"2014-02-04T07:34:16","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=5649&#038;lang=en"},"modified":"2024-05-28T13:35:32","modified_gmt":"2024-05-28T10:35:32","slug":"january-2014-2","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=5649&lang=en","title":{"rendered":"January 2014"},"content":{"rendered":"<ul>\n<li style=\"text-align: justify;\">The works for the construction of the roof slab have been completed in ANALIPSI Station and one traffic lane of Delfon Street has been handed over to the public;<\/li>\n<li style=\"text-align: justify;\">The works for the installation of steel reinforcement at the foundation slab are at an advanced stage;<\/li>\n<li style=\"text-align: justify;\">In AGHIA VARVARA Station, the excavation works have commenced at the south section of the station, as well as in PAPAFI Station;<\/li>\n<li style=\"text-align: justify;\">The works for the construction of diaphragm walls are at an advanced stage in PATRIKIOU Station.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The works for the construction of the roof slab have been completed in ANALIPSI Station and one traffic lane of Delfon Street has been handed over to the public; The works for the installation of steel reinforcement at the foundation slab are at an advanced stage; In AGHIA VARVARA Station, the excavation works have commenced at the south section of the station, as well as in PAPAFI Station; The works for the construction of diaphragm walls are at an advanced stage in PATRIKIOU Station.<\/p>\n","protected":false},"author":9,"featured_media":3393,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[79],"tags":[],"class_list":["post-5649","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-thessaloniki-base-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Jan14_LG.jpg",1024,768,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Jan14_LG.jpg",1024,768,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Jan14_LG.jpg",1024,768,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Jan14_LG-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Jan14_LG-300x225.jpg",300,225,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Jan14_LG.jpg",960,720,false],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Jan14_LG.jpg",1024,768,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Jan14_LG.jpg",1024,768,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Jan14_LG-1024x540.jpg",1024,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Jan14_LG.jpg",1024,768,false],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Jan14_LG-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Jan14_LG-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Jan14_LG-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"elinaki","author_link":"https:\/\/www.emetro.gr\/?author=9"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=79&#038;lang=en\" rel=\"category\">Thessaloniki Base Project progress<\/a>","rttpg_excerpt":"The works for the construction of the roof slab have been completed in ANALIPSI Station and one traffic lane of Delfon Street has been handed over to the public; The works for the installation of steel reinforcement at the foundation slab are at an advanced stage; In AGHIA VARVARA Station, the excavation works have commenced&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5649","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5649"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5649\/revisions"}],"predecessor-version":[{"id":28246,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5649\/revisions\/28246"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/3393"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5649"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5649"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5649"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}