{"id":5623,"date":"2015-03-16T06:51:22","date_gmt":"2015-03-16T04:51:22","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=5623&#038;lang=en"},"modified":"2024-05-28T13:35:31","modified_gmt":"2024-05-28T10:35:31","slug":"february-2015-2","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=5623&lang=en","title":{"rendered":"February 2015"},"content":{"rendered":"<ul>\n<li style=\"text-align: justify;\">New Railway Station: The works for the removal of struts are at an advanced stage;<\/li>\n<li style=\"text-align: justify;\">AGHIA SOPHIA Station: Preparation works for the installation of the 1st row of struts at the south section of the Station are in progress;<\/li>\n<li style=\"text-align: justify;\">SINTRIVANI Station: Preparation works for the detachment of the ancient tomb from the north entrance have been completed, while the archaeological excavation at the south ventilation shaft is in progress;<\/li>\n<li style=\"text-align: justify;\">PANEPISTIMIO Station: Excavation works at the fourth (platform) level have been completed and preparatory works for the construction of the foundation micro-piles have commenced;<\/li>\n<li style=\"text-align: justify;\">EFKLIDIS Station: Platform construction works have been completed. Works for the installation of escalators are at an advanced stage;<\/li>\n<li style=\"text-align: justify;\">ANALIPSI Station and Crossover: The construction of the station foundation slab has been completed. The works for the construction of ventilation shaft 1 and the eastern access are at an advanced staged;<\/li>\n<li style=\"text-align: justify;\">PATRIKIOU Station and Crossover: A section of the worksite area (construction of pedestrian walkways) has been cleared;<\/li>\n<li style=\"text-align: justify;\">DEPOT: The works for the construction of the ground floor slab and the construction of walls and columns at the first floor in Building I are in progress. Works for the construction of walls in Building II are in progress.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>New Railway Station: The works for the removal of struts are at an advanced stage; AGHIA SOPHIA Station: Preparation works for the installation of the 1st row of struts at the south section of the Station are in progress; SINTRIVANI Station: Preparation works for the detachment of the ancient tomb from the north entrance have been completed, while the archaeological excavation at the south ventilation shaft is in progress; PANEPISTIMIO Station: Excavation works at the fourth (platform) level have been completed and preparatory works for the construction of the foundation micro-piles have commenced; EFKLIDIS Station: Platform construction works have been completed. Works for the installation of escalators are at an advanced stage; ANALIPSI Station and Crossover: The construction of the station foundation slab has been completed. The works for the construction of ventilation shaft 1 and the eastern access are at an advanced staged; PATRIKIOU Station and Crossover: A section of the worksite area (construction of pedestrian walkways) has been cleared; DEPOT: The works for the construction of the ground floor slab and the construction of walls and columns at the first floor in Building I are in progress. Works for the construction of walls in Building II are in progress.<\/p>\n","protected":false},"author":9,"featured_media":3354,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[79],"tags":[],"class_list":["post-5623","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-thessaloniki-base-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Feb15_LG.jpg",640,480,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Feb15_LG.jpg",640,480,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Feb15_LG.jpg",640,480,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Feb15_LG-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Feb15_LG-300x225.jpg",300,225,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Feb15_LG.jpg",640,480,false],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Feb15_LG.jpg",640,480,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Feb15_LG.jpg",640,480,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Feb15_LG.jpg",640,480,false],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Feb15_LG.jpg",640,480,false],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Feb15_LG-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Feb15_LG-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Thess_progress_Feb15_LG-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"elinaki","author_link":"https:\/\/www.emetro.gr\/?author=9"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=79&#038;lang=en\" rel=\"category\">Thessaloniki Base Project progress<\/a>","rttpg_excerpt":"New Railway Station: The works for the removal of struts are at an advanced stage; AGHIA SOPHIA Station: Preparation works for the installation of the 1st row of struts at the south section of the Station are in progress; SINTRIVANI Station: Preparation works for the detachment of the ancient tomb from the north entrance have&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5623","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5623"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5623\/revisions"}],"predecessor-version":[{"id":28166,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5623\/revisions\/28166"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/3354"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5623"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5623"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5623"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}