{"id":5564,"date":"2013-05-17T12:02:42","date_gmt":"2013-05-17T09:02:42","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=5564&#038;lang=en"},"modified":"2024-06-27T13:10:37","modified_gmt":"2024-06-27T10:10:37","slug":"april-2013","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=5564&lang=en","title":{"rendered":"April 2013"},"content":{"rendered":"<ul>\n<li style=\"text-align: justify;\">The works for the drilling of forepoles towards Piraeus at TBM start-up Shaft are in progress;<\/li>\n<li style=\"text-align: justify;\">The archaeological excavation works at the south and north-eastern section of the main station, as well as the traffic regulations for the diversion of OTE network at Grevenon Street in NIKEA Station have been completed;<\/li>\n<li style=\"text-align: justify;\">The diversion of the sewage network at P. Mavromichali Street in MANIATIKA Station has been completed;<\/li>\n<li style=\"text-align: justify;\">The works for the diversion of the stormwater network in AGHIA VARVARA Station are in progress.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The works for the drilling of forepoles towards Piraeus at TBM start-up Shaft are in progress; The archaeological excavation works at the south and north-eastern section of the main station, as well as the traffic regulations for the diversion of OTE network at Grevenon Street in NIKEA Station have been completed; The diversion of the sewage network at P. Mavromichali Street in MANIATIKA Station has been completed; The works for the diversion of the stormwater network in AGHIA VARVARA Station are in progress.<\/p>\n","protected":false},"author":9,"featured_media":3262,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[78],"tags":[],"class_list":["post-5564","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-peiraias-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Apr13_LG.jpg",505,730,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Apr13_LG.jpg",505,730,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Apr13_LG.jpg",505,730,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Apr13_LG-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Apr13_LG-208x300.jpg",208,300,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Apr13_LG.jpg",505,730,false],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Apr13_LG.jpg",505,730,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Apr13_LG.jpg",505,730,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Apr13_LG-505x540.jpg",505,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Apr13_LG.jpg",505,730,false],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Apr13_LG-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Apr13_LG-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Apr13_LG-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"elinaki","author_link":"https:\/\/www.emetro.gr\/?author=9"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=78&#038;lang=en\" rel=\"category\">Piraeus Project progress<\/a>","rttpg_excerpt":"The works for the drilling of forepoles towards Piraeus at TBM start-up Shaft are in progress; The archaeological excavation works at the south and north-eastern section of the main station, as well as the traffic regulations for the diversion of OTE network at Grevenon Street in NIKEA Station have been completed; The diversion of the&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5564","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5564"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5564\/revisions"}],"predecessor-version":[{"id":31089,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5564\/revisions\/31089"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/3262"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5564"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5564"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5564"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}