{"id":5550,"date":"2013-12-10T11:52:49","date_gmt":"2013-12-10T09:52:49","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=5550&#038;lang=en"},"modified":"2024-06-25T14:57:15","modified_gmt":"2024-06-25T11:57:15","slug":"november-2013","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=5550&lang=en","title":{"rendered":"November 2013"},"content":{"rendered":"<ul>\n<li style=\"text-align: justify;\">The first 44 out of the overall 6,346 meters of the Project\u2019s tunnel have already been bored and 43 out of the 4,243 rings have already been installed;<\/li>\n<li style=\"text-align: justify;\">The general excavation of KORYDALLOS Station is at an advanced stage, since the subject Station is at the 4th excavation level;<\/li>\n<li style=\"text-align: justify;\">The works for the construction of pre-stressed anchors, as well as the shotcreting works in all levels (1st, 2nd, 3rd and 4th) of excavation in the main NIKEA Station are in progress;<\/li>\n<li style=\"text-align: justify;\">The construction of the diversion, which is necessary for the construction of piles in DIMOTIKO THEATRO Station, was completed;<\/li>\n<li style=\"text-align: justify;\">The works for the networks\u2019 diversion in MANIATIKA Station were completed.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The first 44 out of the overall 6,346 meters of the Project\u2019s tunnel have already been bored and 43 out of the 4,243 rings have already been installed; The general excavation of KORYDALLOS Station is at an advanced stage, since the subject Station is at the 4th excavation level; The works for the construction of pre-stressed anchors, as well as the shotcreting works in all levels (1st, 2nd, 3rd and 4th) of excavation in the main NIKEA Station are in progress; The construction of the diversion, which is necessary for the construction of piles in DIMOTIKO THEATRO Station, was completed; The works for the networks\u2019 diversion in MANIATIKA Station were completed.<\/p>\n","protected":false},"author":9,"featured_media":3241,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[78],"tags":[],"class_list":["post-5550","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-peiraias-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Nov13_LG.jpg",1024,683,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Nov13_LG.jpg",1024,683,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Nov13_LG.jpg",1024,683,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Nov13_LG-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Nov13_LG-300x200.jpg",300,200,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Nov13_LG.jpg",960,640,false],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Nov13_LG.jpg",1024,683,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Nov13_LG.jpg",1024,683,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Nov13_LG-1024x540.jpg",1024,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Nov13_LG.jpg",1024,683,false],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Nov13_LG-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Nov13_LG-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Nov13_LG-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"elinaki","author_link":"https:\/\/www.emetro.gr\/?author=9"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=78&#038;lang=en\" rel=\"category\">Piraeus Project progress<\/a>","rttpg_excerpt":"The first 44 out of the overall 6,346 meters of the Project\u2019s tunnel have already been bored and 43 out of the 4,243 rings have already been installed; The general excavation of KORYDALLOS Station is at an advanced stage, since the subject Station is at the 4th excavation level; The works for the construction of&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5550","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5550"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5550\/revisions"}],"predecessor-version":[{"id":31059,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5550\/revisions\/31059"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/3241"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5550"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5550"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5550"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}