{"id":5546,"date":"2014-02-07T11:46:42","date_gmt":"2014-02-07T09:46:42","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=5546&#038;lang=en"},"modified":"2024-05-28T13:30:56","modified_gmt":"2024-05-28T10:30:56","slug":"january-2014","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=5546&lang=en","title":{"rendered":"January 2014"},"content":{"rendered":"<ul>\n<li style=\"text-align: justify;\">The general excavation (6th level) along with the temporary retaining structures in the area of KORYDALLOS Station are at a completion percentage of 89%;<\/li>\n<li style=\"text-align: justify;\">The worksite fencing in TAXIARCHON Shaft in AGHIA VARVARA Station is in progress;<\/li>\n<li style=\"text-align: justify;\">The main excavation works in the area of NIKEA Station (C\/C) is at percentage of 66%, while the construction of pre-stressed anchors is at percentage of 72%;<\/li>\n<li style=\"text-align: justify;\">The construction of piles in the area of MANIATIKA Station is in progress.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The general excavation (6th level) along with the temporary retaining structures in the area of KORYDALLOS Station are at a completion percentage of 89%; The worksite fencing in TAXIARCHON Shaft in AGHIA VARVARA Station is in progress; The main excavation works in the area of NIKEA Station (C\/C) is at percentage of 66%, while the construction of pre-stressed anchors is at percentage of 72%; The construction of piles in the area of MANIATIKA Station is in progress.<\/p>\n","protected":false},"author":9,"featured_media":3235,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[78],"tags":[],"class_list":["post-5546","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-peiraias-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Jan14_LG.jpg",1024,683,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Jan14_LG.jpg",1024,683,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Jan14_LG.jpg",1024,683,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Jan14_LG-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Jan14_LG-300x200.jpg",300,200,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Jan14_LG.jpg",960,640,false],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Jan14_LG.jpg",1024,683,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Jan14_LG.jpg",1024,683,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Jan14_LG-1024x540.jpg",1024,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Jan14_LG.jpg",1024,683,false],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Jan14_LG-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Jan14_LG-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/07\/AM_Peiraias_progress_Jan14_LG-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"elinaki","author_link":"https:\/\/www.emetro.gr\/?author=9"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=78&#038;lang=en\" rel=\"category\">Piraeus Project progress<\/a>","rttpg_excerpt":"The general excavation (6th level) along with the temporary retaining structures in the area of KORYDALLOS Station are at a completion percentage of 89%; The worksite fencing in TAXIARCHON Shaft in AGHIA VARVARA Station is in progress; The main excavation works in the area of NIKEA Station (C\/C) is at percentage of 66%, while the&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5546","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5546"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5546\/revisions"}],"predecessor-version":[{"id":28244,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5546\/revisions\/28244"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/3235"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5546"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5546"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5546"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}