{"id":5027,"date":"2011-01-20T11:06:29","date_gmt":"2011-01-20T09:06:29","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=5027&#038;lang=en"},"modified":"2024-07-02T15:02:46","modified_gmt":"2024-07-02T12:02:46","slug":"allocation-of-credit-for-the-partial-funding-of-attiko-metro-s-a","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=5027&lang=en","title":{"rendered":"Allocation of credit for the partial funding of ATTIKO METRO S.A."},"content":{"rendered":"<p style=\"text-align: justify;\">The Minister of Infrastructure, Transport &amp; Networks, <strong>Mr. Dimitris Reppas<\/strong>, approved the allocation of a credit amounting to \u20ac 357,675,000 for the partial funding of ATTIKO METRO S.A. construction plan in both Athens and Thessaloniki.<\/p>\n<p style=\"text-align: justify;\">In particular, a credit amounting to \u20ac163,000,000 has been approved for the completion of Thessaloniki Metro and its Transfer Stations.<\/p>\n<p style=\"text-align: justify;\">Moreover, as regards Athens Metro Line 3 extension, a credit amounting to \u20ac41.3 million has been approved for Aghia Marina (Haidari) \u2013 Piraeus Section, while a credit amounting to \u20ac 75.375 million has been approved for Egaleo \u2013 Aghia Marina (Haidari) Section (AGHIA MARINA (HAIDARI) Transfer Station and Eleonas Depot). For Stations and Electromechanical Works in Athens Metro Line 3 extension, a credit amounting to \u20ac 36.75 million has been approved.<\/p>\n<p style=\"text-align: justify;\">Finally, with regard to Line 2 Extension to Elliniko (from AL. PANAGOULIS Station to the \u201cOld Airport\u201d), a credit amounting to \u20ac 41.25 million has been approved.<\/p>\n<p style=\"text-align: justify;\"><a href=\"https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_20-1-2011_LG.jpg\"><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-medium wp-image-2024\" src=\"https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_20-1-2011_LG-300x179.jpg\" alt=\"AM_Press_20-1-2011_LG\" width=\"300\" height=\"179\" srcset=\"https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_20-1-2011_LG-300x179.jpg 300w, https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_20-1-2011_LG-768x459.jpg 768w, https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_20-1-2011_LG.jpg 1000w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Minister of Infrastructure, Transport &amp; Networks, Mr. Dimitris Reppas, approved the allocation of a credit amounting to \u20ac 357,675,000 for the partial funding of ATTIKO METRO S.A. construction plan in both Athens and Thessaloniki. In particular, a credit amounting to \u20ac163,000,000 has been approved for the completion of Thessaloniki Metro and its Transfer Stations. Moreover, as regards Athens Metro Line 3 extension, a credit amounting to \u20ac41.3 million has been approved for Aghia Marina (Haidari) \u2013 Piraeus Section, while a credit amounting to \u20ac 75.375 million has been approved for Egaleo \u2013 Aghia Marina (Haidari) Section (AGHIA MARINA (HAIDARI) Transfer Station and Eleonas Depot). For Stations and Electromechanical Works in Athens Metro Line 3 extension, a credit amounting to \u20ac 36.75 million has been approved. Finally, with regard to Line 2 Extension to Elliniko (from AL. PANAGOULIS Station to the \u201cOld Airport\u201d), a credit amounting to \u20ac 41.25 million has been approved.<\/p>\n","protected":false},"author":9,"featured_media":2024,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[77,73],"tags":[],"class_list":["post-5027","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-press-releases-front-page-en","category-press-releases-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_20-1-2011_LG.jpg",1000,598,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_20-1-2011_LG.jpg",1000,598,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_20-1-2011_LG.jpg",1000,598,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_20-1-2011_LG-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_20-1-2011_LG-300x179.jpg",300,179,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_20-1-2011_LG.jpg",960,574,false],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_20-1-2011_LG.jpg",1000,598,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_20-1-2011_LG.jpg",1000,598,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_20-1-2011_LG-1000x540.jpg",1000,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_20-1-2011_LG.jpg",1000,598,false],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_20-1-2011_LG-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_20-1-2011_LG-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_20-1-2011_LG-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"elinaki","author_link":"https:\/\/www.emetro.gr\/?author=9"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=77&#038;lang=en\" rel=\"category\">Front Page Press Releases<\/a> <a href=\"https:\/\/www.emetro.gr\/?cat=73&#038;lang=en\" rel=\"category\">Press Releases<\/a>","rttpg_excerpt":"The Minister of Infrastructure, Transport &amp; Networks, Mr. Dimitris Reppas, approved the allocation of a credit amounting to \u20ac 357,675,000 for the partial funding of ATTIKO METRO S.A. construction plan in both Athens and Thessaloniki. In particular, a credit amounting to \u20ac163,000,000 has been approved for the completion of Thessaloniki Metro and its Transfer Stations.&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5027","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5027"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5027\/revisions"}],"predecessor-version":[{"id":31251,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/5027\/revisions\/31251"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/2024"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5027"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5027"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5027"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}