{"id":4733,"date":"2014-09-12T13:14:19","date_gmt":"2014-09-12T10:14:19","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=4733&#038;lang=en"},"modified":"2024-05-28T13:34:35","modified_gmt":"2024-05-28T10:34:35","slug":"athens-metro-aghia-marina-dimotiko-theatro-line-3-extension-piraeus-station-traffic-arrangements","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=4733&lang=en","title":{"rendered":"ATHENS METRO &#8211; AGHIA MARINA \u2013 DIMOTIKO THEATRO LINE 3 EXTENSION, PIRAEUS Station \u2013 Traffic Arrangements"},"content":{"rendered":"<p style=\"text-align: justify;\" align=\"justify\"><b>The following traffic arrangements<\/b> (see attached map) shall be implemented as of <b>Tuesday September 16<sup>th<\/sup>, 2014 <\/b>for the construction of PIRAEUS Station to progress. More specifically:<\/p>\n<ol style=\"text-align: justify;\">\n<li>The traffic flow of Akti Kallimassioti street (extension of Akti Possidonos street) towards the centre of Piraeus, is shifted parallel with the sea, while its traffic lanes are reduced to two;<\/li>\n<li>The traffic flow of Akti Kallimassioti towards Aghios Dionysios remains as is;<\/li>\n<li>The overhead pedestrian bridge connecting the port of Piraeus with PIRAEUS ISAP Station will no longer be in operation. Pedestrian access from ISAP Station towards the port and vice versa will be provided from Loudovikou street through two pedestrian accesses;<\/li>\n<li>Finally, all existing Mass Transport lines passing through this specific area remain the same.<\/li>\n<\/ol>\n<p style=\"text-align: justify;\"><b><\/b>The subject traffic arrangements will <b>approximately <\/b>last <b>until the end of September 2014 \u2013 early October 2014,<\/b>while there will be a subsequent phase of traffic arrangements for which a relevant press release will be issued on time.<\/p>\n<p style=\"text-align: justify;\" align=\"justify\">It is noted that ATTIKO METRO S.A., in cooperation with the Contracting Joint Venture, <b>introduces all indicative measures on a daily basis<\/b> in order to facilitate the adjacent businesses and minimize any disturbance caused by all construction works needed for PIRAEUS Station.<\/p>\n<p style=\"text-align: justify;\" align=\"justify\">ATTIKO METRO S.A. would like to thank the public for its cooperation and requests its understanding for the temporary disturbance.<\/p>\n<p style=\"text-align: justify;\" align=\"justify\">ATTIKO METRO S.A. Communications Dept. (tel.: 210-6792032, 210-6792300, fax: 210-6792093, e-mail: <a href=\"mailto:info@ametro.gr\"><u><span style=\"color: #0000ff;\">info@ametro.gr<\/span><\/u><\/a>) remains at your disposal for any additional information.<\/p>\n<div id='gallery-1' class='gallery galleryid-4733 gallery-columns-2 gallery-size-medium'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_12.09.2014_3_LG.jpg'><img fetchpriority=\"high\" decoding=\"async\" width=\"200\" height=\"300\" src=\"https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_12.09.2014_3_LG-200x300.jpg\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_12.09.2014_3_LG-200x300.jpg 200w, https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_12.09.2014_3_LG.jpg 580w\" sizes=\"(max-width: 200px) 100vw, 200px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_12.09.2014_4_LG.jpg'><img decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_12.09.2014_4_LG-300x200.jpg\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_12.09.2014_4_LG-300x200.jpg 300w, https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_12.09.2014_4_LG-768x512.jpg 768w, https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_12.09.2014_4_LG.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>The following traffic arrangements (see attached map) shall be implemented as of Tuesday September 16th, 2014 for the construction of PIRAEUS Station to progress. More specifically: The traffic flow of Akti Kallimassioti street (extension of Akti Possidonos street) towards the centre of Piraeus, is shifted parallel with the sea, while its traffic lanes are reduced to two; The traffic flow of Akti Kallimassioti towards Aghios Dionysios remains as is; The overhead pedestrian bridge connecting the port of Piraeus with PIRAEUS ISAP Station will no longer be in operation. Pedestrian access from ISAP Station towards the port and vice versa will be provided from Loudovikou street through two pedestrian accesses; Finally, all existing Mass Transport lines passing through this specific area remain the same. The subject traffic arrangements will approximately last until the end of September 2014 \u2013 early October 2014,while there will be a subsequent phase of traffic arrangements for which a relevant press release will be issued on time. It is noted that ATTIKO METRO S.A., in cooperation with the Contracting Joint Venture, introduces all indicative measures on a daily basis in order to facilitate the adjacent businesses and minimize any disturbance caused by all construction works needed for PIRAEUS Station. ATTIKO METRO S.A. would like to thank the public for its cooperation and requests its understanding for the temporary disturbance. ATTIKO METRO S.A. Communications Dept. (tel.: 210-6792032, 210-6792300, fax: 210-6792093, e-mail: info@ametro.gr) remains at your disposal for any additional information.<\/p>\n","protected":false},"author":9,"featured_media":2571,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[77,73],"tags":[],"class_list":["post-4733","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-press-releases-front-page-en","category-press-releases-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_12.09.2014_1_LG.jpg",1024,683,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_12.09.2014_1_LG.jpg",1024,683,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_12.09.2014_1_LG.jpg",1024,683,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_12.09.2014_1_LG-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_12.09.2014_1_LG-300x200.jpg",300,200,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_12.09.2014_1_LG.jpg",960,640,false],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_12.09.2014_1_LG.jpg",1024,683,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_12.09.2014_1_LG.jpg",1024,683,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_12.09.2014_1_LG-1024x540.jpg",1024,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_12.09.2014_1_LG.jpg",1024,683,false],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_12.09.2014_1_LG-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_12.09.2014_1_LG-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2016\/06\/AM_Press_12.09.2014_1_LG-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"elinaki","author_link":"https:\/\/www.emetro.gr\/?author=9"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=77&#038;lang=en\" rel=\"category\">Front Page Press Releases<\/a> <a href=\"https:\/\/www.emetro.gr\/?cat=73&#038;lang=en\" rel=\"category\">Press Releases<\/a>","rttpg_excerpt":"The following traffic arrangements (see attached map) shall be implemented as of Tuesday September 16th, 2014 for the construction of PIRAEUS Station to progress. More specifically: The traffic flow of Akti Kallimassioti street (extension of Akti Possidonos street) towards the centre of Piraeus, is shifted parallel with the sea, while its traffic lanes are reduced&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/4733","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4733"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/4733\/revisions"}],"predecessor-version":[{"id":28201,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/4733\/revisions\/28201"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/2571"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4733"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4733"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4733"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}