{"id":31621,"date":"2019-10-07T14:45:00","date_gmt":"2019-10-07T11:45:00","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=31621"},"modified":"2024-07-03T14:46:07","modified_gmt":"2024-07-03T11:46:07","slug":"september-2019-3","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=31621&lang=en","title":{"rendered":"SEPTEMBER 2019"},"content":{"rendered":"\n<p><strong><u>DOUBLE TRACK <\/u><\/strong><strong><u>\u039d\u0391\u03a4\u039c<\/u><\/strong> <strong><u>START TUNNEL<\/u><\/strong><\/p>\n\n\n\n<p><strong>Works<\/strong> <strong>have<\/strong> <strong>been<\/strong> <strong>completed.<\/strong><\/p>\n\n\n\n<p><strong><u>KOMNINOU SHAFT<\/u><\/strong><\/p>\n\n\n\n<p><strong>The following works have been completed<\/strong><strong>:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Masonry works, plastering works, door installation, industrial floor, painting works, installation of grids at street level, staircase balustrades, hatch<\/li>\n\n\n\n<li>Reinstatement at street level<\/li>\n<\/ul>\n\n\n\n<p><strong><u>AGHIA VARVARA STATION<\/u><\/strong><\/p>\n\n\n\n<p><strong>The following works are in progress<\/strong><strong>:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Reinstatement at street level \u2013 Square level (granites, pathways, marble, fountain)<\/li>\n\n\n\n<li>Installation of false ceilings at the platform and concourse levels<\/li>\n\n\n\n<li>Cladding of walls and columns (steel, glass, etc.)<\/li>\n<\/ul>\n\n\n\n<p><strong><u>MEGALOU<\/u><\/strong> <strong><u>ALEXANDROU<\/u><\/strong> <strong><u>SHAFT<\/u><\/strong><\/p>\n\n\n\n<p><strong>Works<\/strong> <strong>have<\/strong> <strong>been<\/strong> <strong>completed.<\/strong><\/p>\n\n\n\n<p><strong><u>KORYDALLOS STATION<\/u><\/strong><\/p>\n\n\n\n<p><strong>The<\/strong> <strong>following<\/strong> <strong>works<\/strong> <strong>are<\/strong> <strong>in<\/strong> <strong>progress:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Cladding of walls and columns<\/li>\n\n\n\n<li>Installation of false ceiling<\/li>\n\n\n\n<li>Installation of ventilation grids<\/li>\n\n\n\n<li>Backfilling<\/li>\n<\/ul>\n\n\n\n<p><strong><u>NIKEA STATION<\/u><\/strong><\/p>\n\n\n\n<p><strong><u>MAIN STATION<\/u><\/strong><\/p>\n\n\n\n<p><strong>The<\/strong> <strong>following<\/strong> <strong>works<\/strong> <strong>are<\/strong> <strong>in<\/strong> <strong>progress:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Final reinstatement at the station street level (\u2013 0)<\/li>\n\n\n\n<li>Installation of horizontal false ceiling panels at the concourse (\u2013 2) and platform (\u2013 3) levels of the Station<\/li>\n\n\n\n<li>E\/M works<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>DOUBLE TRACK \u039d\u0391\u03a4\u039c START TUNNEL Works have been completed. KOMNINOU SHAFT The following works have been completed: AGHIA VARVARA STATION The following works are in progress: MEGALOU ALEXANDROU SHAFT Works have been completed. KORYDALLOS STATION The following works are in progress: NIKEA STATION MAIN STATION The following works are in progress:<\/p>\n","protected":false},"author":10,"featured_media":15733,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[78],"tags":[],"class_list":["post-31621","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-peiraias-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/10\/IMG_0206-scaled.jpg",2560,1706,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/10\/IMG_0206-scaled.jpg",2560,1706,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/10\/IMG_0206-scaled.jpg",2560,1706,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/10\/IMG_0206-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/10\/IMG_0206-300x200.jpg",300,200,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/10\/IMG_0206-1024x683.jpg",960,640,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/10\/IMG_0206-1536x1024.jpg",1536,1024,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/10\/IMG_0206-2048x1365.jpg",2048,1365,true],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/10\/IMG_0206-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/10\/IMG_0206-1140x760.jpg",1140,760,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/10\/IMG_0206-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/10\/IMG_0206-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/10\/IMG_0206-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"esevastou","author_link":"https:\/\/www.emetro.gr\/?author=10"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=78&#038;lang=en\" rel=\"category\">Piraeus Project progress<\/a>","rttpg_excerpt":"DOUBLE TRACK \u039d\u0391\u03a4\u039c START TUNNEL Works have been completed. KOMNINOU SHAFT The following works have been completed: AGHIA VARVARA STATION The following works are in progress: MEGALOU ALEXANDROU SHAFT Works have been completed. KORYDALLOS STATION The following works are in progress: NIKEA STATION MAIN STATION The following works are in progress:","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/31621","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=31621"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/31621\/revisions"}],"predecessor-version":[{"id":31622,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/31621\/revisions\/31622"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/15733"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=31621"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=31621"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=31621"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}