{"id":31615,"date":"2019-09-16T14:42:00","date_gmt":"2019-09-16T11:42:00","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=31615"},"modified":"2024-07-03T14:42:36","modified_gmt":"2024-07-03T11:42:36","slug":"august-2019-3","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=31615&lang=en","title":{"rendered":"AUGUST 2019"},"content":{"rendered":"\n<p><strong><u>KORYDALLOS STATION<\/u><\/strong><\/p>\n\n\n\n<p><strong>The<\/strong> <strong>following<\/strong> <strong>works<\/strong> <strong>are<\/strong> <strong>in<\/strong> <strong>progress:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Door installation<\/li>\n\n\n\n<li>Ceramic tiles installation<\/li>\n\n\n\n<li>Granite or marble installation<\/li>\n<\/ul>\n\n\n\n<p><strong><u>MANIATIKA STATION<\/u><\/strong><\/p>\n\n\n\n<p><strong><u>UNDERGROUND<\/u><\/strong> <strong><u>NATM<\/u><\/strong> <strong><u>SECTIONS<\/u><\/strong> <strong><u>OF<\/u><\/strong> <strong><u>THE<\/u><\/strong> <strong><u>STATION<\/u><\/strong><strong><u> (<\/u><\/strong><strong><u>\u039d\u0391\u03a4\u039c<\/u><\/strong><strong><u>)<\/u><\/strong><\/p>\n\n\n\n<p><strong>The<\/strong> <strong>following<\/strong> <strong>works<\/strong> <strong>have been completed:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Permanent lining of the lower transverse tunnel and of the west elevator<\/li>\n<\/ul>\n\n\n\n<p><strong><u>DIMOTIKO THEATRO STATION<\/u><\/strong><\/p>\n\n\n\n<p><strong><u>UNDERGROUND SECTION OF THE STATION<\/u><\/strong><\/p>\n\n\n\n<p><strong>The following works have been completed<\/strong><strong>:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Permanent lining concreting works<\/li>\n\n\n\n<li>Concreting works for masonry walls and the platform slab<\/li>\n<\/ul>\n\n\n\n<p><strong><u>ENTRAMCE TO KORAI SQUARE<\/u><\/strong><\/p>\n\n\n\n<p><strong>The following works have been completed<\/strong><strong>:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Concreting works for the permanent lining of the floor, the perimeter walls and the ceiling (the area of the elevator is pending)<\/li>\n<\/ul>\n\n\n\n<p><strong><u>PANEPISTIMIO SHAFT<\/u><\/strong><\/p>\n\n\n\n<p><strong>The following works have been completed<\/strong><strong>:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Archaeological excavation and deconstruction<\/li>\n\n\n\n<li>Excavation \u2013 temporary retaining of shaft and pumping station<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>KORYDALLOS STATION The following works are in progress: MANIATIKA STATION UNDERGROUND NATM SECTIONS OF THE STATION (\u039d\u0391\u03a4\u039c) The following works have been completed: DIMOTIKO THEATRO STATION UNDERGROUND SECTION OF THE STATION The following works have been completed: ENTRAMCE TO KORAI SQUARE The following works have been completed: PANEPISTIMIO SHAFT The following works have been completed:<\/p>\n","protected":false},"author":10,"featured_media":15548,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[78],"tags":[],"class_list":["post-31615","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-peiraias-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/09\/IMG_0218-scaled.jpg",2560,1706,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/09\/IMG_0218-scaled.jpg",2560,1706,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/09\/IMG_0218-scaled.jpg",2560,1706,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/09\/IMG_0218-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/09\/IMG_0218-300x200.jpg",300,200,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/09\/IMG_0218-1024x683.jpg",960,640,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/09\/IMG_0218-1536x1024.jpg",1536,1024,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/09\/IMG_0218-2048x1365.jpg",2048,1365,true],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/09\/IMG_0218-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/09\/IMG_0218-1140x760.jpg",1140,760,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/09\/IMG_0218-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/09\/IMG_0218-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2019\/09\/IMG_0218-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"esevastou","author_link":"https:\/\/www.emetro.gr\/?author=10"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=78&#038;lang=en\" rel=\"category\">Piraeus Project progress<\/a>","rttpg_excerpt":"KORYDALLOS STATION The following works are in progress: MANIATIKA STATION UNDERGROUND NATM SECTIONS OF THE STATION (\u039d\u0391\u03a4\u039c) The following works have been completed: DIMOTIKO THEATRO STATION UNDERGROUND SECTION OF THE STATION The following works have been completed: ENTRAMCE TO KORAI SQUARE The following works have been completed: PANEPISTIMIO SHAFT The following works have been completed:","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/31615","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=31615"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/31615\/revisions"}],"predecessor-version":[{"id":31616,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/31615\/revisions\/31616"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/15548"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=31615"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=31615"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=31615"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}