{"id":26458,"date":"2023-06-27T11:05:09","date_gmt":"2023-06-27T08:05:09","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=26458"},"modified":"2024-06-21T14:16:25","modified_gmt":"2024-06-21T11:16:25","slug":"february-2023-2","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=26458&lang=en","title":{"rendered":"February 2023"},"content":{"rendered":"<ul>\n<li><strong>Kritis Shaft:<\/strong> In progress are works for the installation of steel balustrades.<\/li>\n<li><strong>NOMARCHIA Station:<\/strong> In progress are works for the installation of Platform Screen Doors (PSDs).<\/li>\n<li><strong>KALAMARIA Station:<\/strong> In progress are street level reinstatement works in Pontou street upstream traffic flow, as well as works for the completion of the installation of escalators.<\/li>\n<li><strong>ARETSOU Station:<\/strong> In progress are works for the installation of PSDs.<\/li>\n<li><strong>NEA KRINI Station:<\/strong> In progress are street level reinstatement works and works related to the repair of waterproofing. Moreover, in progress are works for the installation of air ducts and equipment of the ventilation\/air conditioning system.<\/li>\n<li><strong>MIKRA Station: <\/strong>In progress are works for the installation of fiber cement boards at level -1, as well as works for the installation of granite floor at the platform level.<\/li>\n<\/ul>\n<p><strong>TRACKWORK:<\/strong><\/p>\n<p>In progress are works for the installation of electrical trays at interstations 4 and 5.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kritis Shaft: In progress are works for the installation of steel balustrades. NOMARCHIA Station: In progress are works for the installation of Platform Screen Doors (PSDs). KALAMARIA Station: In progress are street level reinstatement works in Pontou street upstream traffic flow, as well as works for the completion of the installation of escalators. ARETSOU Station: In progress are works for the installation of PSDs. NEA KRINI Station: In progress are street level reinstatement works and works related to the repair of waterproofing. Moreover, in progress are works for the installation of air ducts and equipment of the ventilation\/air conditioning system. MIKRA Station: In progress are works for the installation of fiber cement boards at level -1, as well as works for the installation of granite floor at the platform level. TRACKWORK: In progress are works for the installation of electrical trays at interstations 4 and 5.<\/p>\n","protected":false},"author":4,"featured_media":25814,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[544],"tags":[],"class_list":["post-26458","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kalamaria-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2023\/03\/KALAMARIA_02_2023-scaled.jpg",2560,1700,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2023\/03\/KALAMARIA_02_2023-scaled.jpg",2560,1700,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2023\/03\/KALAMARIA_02_2023-scaled.jpg",2560,1700,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2023\/03\/KALAMARIA_02_2023-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2023\/03\/KALAMARIA_02_2023-300x199.jpg",300,199,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2023\/03\/KALAMARIA_02_2023-1024x680.jpg",960,638,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2023\/03\/KALAMARIA_02_2023-1536x1020.jpg",1536,1020,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2023\/03\/KALAMARIA_02_2023-2048x1360.jpg",2048,1360,true],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2023\/03\/KALAMARIA_02_2023-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2023\/03\/KALAMARIA_02_2023-1140x757.jpg",1140,757,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2023\/03\/KALAMARIA_02_2023-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2023\/03\/KALAMARIA_02_2023-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2023\/03\/KALAMARIA_02_2023-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=544&#038;lang=en\" rel=\"category\">Kalamaria Project progress<\/a>","rttpg_excerpt":"Kritis Shaft: In progress are works for the installation of steel balustrades. NOMARCHIA Station: In progress are works for the installation of Platform Screen Doors (PSDs). KALAMARIA Station: In progress are street level reinstatement works in Pontou street upstream traffic flow, as well as works for the completion of the installation of escalators. ARETSOU Station:&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/26458","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=26458"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/26458\/revisions"}],"predecessor-version":[{"id":26459,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/26458\/revisions\/26459"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/25814"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=26458"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=26458"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=26458"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}