{"id":25036,"date":"2022-11-24T14:10:45","date_gmt":"2022-11-24T11:10:45","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=25036"},"modified":"2024-06-25T10:45:55","modified_gmt":"2024-06-25T07:45:55","slug":"october-2022-3","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=25036&lang=en","title":{"rendered":"October 2022"},"content":{"rendered":"<ul>\n<li><strong>KALAMARIA Station:<\/strong> In progress are works for the installation of stainless steel balustrades.<\/li>\n<li><strong>ARETSOU Station:<\/strong> In progress are works for the installation of the Platform Screen Door (PSD) system.<\/li>\n<li><strong>NEA KRINI Station:<\/strong> In progress are works for the installation of storm and waste water pumps, collectors and discharge networks.<\/li>\n<li><strong>MIKRA Station: <\/strong>In progress are works for the installation of networks and equipment for the ventilation \/ air conditioning system.<\/li>\n<\/ul>\n<p><strong>TRACKWORK:<\/strong><\/p>\n<p>In progress are works for the installation of the fire fighting network at interstation 1 \/ track 2, as well as works for the installation of electrical trays at interstations 3 and 4 \/ track 2.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>KALAMARIA Station: In progress are works for the installation of stainless steel balustrades. ARETSOU Station: In progress are works for the installation of the Platform Screen Door (PSD) system. NEA KRINI Station: In progress are works for the installation of storm and waste water pumps, collectors and discharge networks. MIKRA Station: In progress are works for the installation of networks and equipment for the ventilation \/ air conditioning system. TRACKWORK: In progress are works for the installation of the fire fighting network at interstation 1 \/ track 2, as well as works for the installation of electrical trays at interstations 3 and 4 \/ track 2.<\/p>\n","protected":false},"author":4,"featured_media":25009,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[544],"tags":[],"class_list":["post-25036","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kalamaria-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/11\/KALAMARIA_10_2022-scaled.jpg",1440,2560,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/11\/KALAMARIA_10_2022-scaled.jpg",1440,2560,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/11\/KALAMARIA_10_2022-scaled.jpg",1440,2560,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/11\/KALAMARIA_10_2022-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/11\/KALAMARIA_10_2022-169x300.jpg",169,300,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/11\/KALAMARIA_10_2022-576x1024.jpg",576,1024,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/11\/KALAMARIA_10_2022-864x1536.jpg",864,1536,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/11\/KALAMARIA_10_2022-1152x2048.jpg",1152,2048,true],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/11\/KALAMARIA_10_2022-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/11\/KALAMARIA_10_2022-1140x2027.jpg",1140,2027,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/11\/KALAMARIA_10_2022-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/11\/KALAMARIA_10_2022-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/11\/KALAMARIA_10_2022-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=544&#038;lang=en\" rel=\"category\">Kalamaria Project progress<\/a>","rttpg_excerpt":"KALAMARIA Station: In progress are works for the installation of stainless steel balustrades. ARETSOU Station: In progress are works for the installation of the Platform Screen Door (PSD) system. NEA KRINI Station: In progress are works for the installation of storm and waste water pumps, collectors and discharge networks. MIKRA Station: In progress are works&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/25036","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=25036"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/25036\/revisions"}],"predecessor-version":[{"id":25037,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/25036\/revisions\/25037"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/25009"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=25036"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=25036"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=25036"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}