{"id":23145,"date":"2022-05-20T12:38:30","date_gmt":"2022-05-20T09:38:30","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=23145"},"modified":"2024-06-25T11:00:42","modified_gmt":"2024-06-25T08:00:42","slug":"april-2022-2","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=23145&lang=en","title":{"rendered":"April 2022"},"content":{"rendered":"<p>\u2022\tNOMARCHIA Station (Station &amp; Crossover): In progress are works for the installation of a lift housing structure at street level. In the area of the Crossover in progress are works for the completion of the installation of cylinders of the automatic gas fire suppression system.<br \/>\n\u2022\tARETSOU Station: In progress are works for the installation of transformer bases in the lighting\/ auxiliary power and the traction power substations.<br \/>\n\u2022\tMICRA Station: In progress are preliminary works for the installation of the Platform Screen Doors system.<br \/>\n\u2022\tTRACKWORK: In progress are works for the construction of crossovers\/ crossing in the area of Nomarchia Crossover, as well as works for the installation of handrails inside the tunnel, track 1.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u2022 NOMARCHIA Station (Station &amp; Crossover): In progress are works for the installation of a lift housing structure at street level. In the area of the Crossover in progress are works for the completion of the installation of cylinders of the automatic gas fire suppression system. \u2022 ARETSOU Station: In progress are works for the installation of transformer bases in the lighting\/ auxiliary power and the traction power substations. \u2022 MICRA Station: In progress are preliminary works for the installation of the Platform Screen Doors system. \u2022 TRACKWORK: In progress are works for the construction of crossovers\/ crossing in the area of Nomarchia Crossover, as well as works for the installation of handrails inside the tunnel, track 1.<\/p>\n","protected":false},"author":4,"featured_media":23138,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[544],"tags":[],"class_list":["post-23145","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kalamaria-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/05\/KALAMARIA_04_2022.jpg",1194,1026,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/05\/KALAMARIA_04_2022.jpg",1194,1026,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/05\/KALAMARIA_04_2022.jpg",1194,1026,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/05\/KALAMARIA_04_2022-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/05\/KALAMARIA_04_2022-300x258.jpg",300,258,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/05\/KALAMARIA_04_2022-1024x880.jpg",960,825,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/05\/KALAMARIA_04_2022.jpg",1194,1026,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/05\/KALAMARIA_04_2022.jpg",1194,1026,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/05\/KALAMARIA_04_2022-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/05\/KALAMARIA_04_2022-1140x980.jpg",1140,980,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/05\/KALAMARIA_04_2022-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/05\/KALAMARIA_04_2022-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/05\/KALAMARIA_04_2022-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=544&#038;lang=en\" rel=\"category\">Kalamaria Project progress<\/a>","rttpg_excerpt":"\u2022 NOMARCHIA Station (Station &amp; Crossover): In progress are works for the installation of a lift housing structure at street level. In the area of the Crossover in progress are works for the completion of the installation of cylinders of the automatic gas fire suppression system. \u2022 ARETSOU Station: In progress are works for the&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/23145","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=23145"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/23145\/revisions"}],"predecessor-version":[{"id":29012,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/23145\/revisions\/29012"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/23138"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=23145"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=23145"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=23145"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}