{"id":23143,"date":"2022-05-20T12:35:01","date_gmt":"2022-05-20T09:35:01","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=23143"},"modified":"2024-06-25T11:01:48","modified_gmt":"2024-06-25T08:01:48","slug":"march-2022-3","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=23143&lang=en","title":{"rendered":"March 2022"},"content":{"rendered":"<p>\u2022\tKritis Shaft: In progress are works for the installation of tunnel ventilation equipment.<br \/>\n\u2022\tNOMARCHIA Station (Station &amp; Crossover): In progress are works for the installation of Inergen cylinders in the Crossover.<br \/>\n\u2022\tARETSOU Station: In progress are works for the installation of granite flooring in entrances (surface level) and the execution of SAT tests.<br \/>\n\u2022\tNEA KRINI Station: In progress are works for final checking and adjustments of the Platform Screen Doors.<br \/>\n\u2022\tMICRA Station: In progress are works for the construction of infrastructure for the lighting and irrigation networks, as well as works for the installation of granite flooring in entrances (surface level).<br \/>\n\u2022\tTRACKWORK: In progress are works for the installation of crossovers\/crossing in the area of Nomarchia Crossover.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u2022 Kritis Shaft: In progress are works for the installation of tunnel ventilation equipment. \u2022 NOMARCHIA Station (Station &amp; Crossover): In progress are works for the installation of Inergen cylinders in the Crossover. \u2022 ARETSOU Station: In progress are works for the installation of granite flooring in entrances (surface level) and the execution of SAT tests. \u2022 NEA KRINI Station: In progress are works for final checking and adjustments of the Platform Screen Doors. \u2022 MICRA Station: In progress are works for the construction of infrastructure for the lighting and irrigation networks, as well as works for the installation of granite flooring in entrances (surface level). \u2022 TRACKWORK: In progress are works for the installation of crossovers\/crossing in the area of Nomarchia Crossover.<\/p>\n","protected":false},"author":4,"featured_media":23073,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[544],"tags":[],"class_list":["post-23143","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kalamaria-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/04\/Kalamaria_03_2022.jpg",1600,1200,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/04\/Kalamaria_03_2022.jpg",1600,1200,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/04\/Kalamaria_03_2022.jpg",1600,1200,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/04\/Kalamaria_03_2022-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/04\/Kalamaria_03_2022-300x225.jpg",300,225,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/04\/Kalamaria_03_2022-1024x768.jpg",960,720,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/04\/Kalamaria_03_2022-1536x1152.jpg",1536,1152,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/04\/Kalamaria_03_2022.jpg",1600,1200,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/04\/Kalamaria_03_2022-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/04\/Kalamaria_03_2022-1140x855.jpg",1140,855,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/04\/Kalamaria_03_2022-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/04\/Kalamaria_03_2022-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/04\/Kalamaria_03_2022-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=544&#038;lang=en\" rel=\"category\">Kalamaria Project progress<\/a>","rttpg_excerpt":"\u2022 Kritis Shaft: In progress are works for the installation of tunnel ventilation equipment. \u2022 NOMARCHIA Station (Station &amp; Crossover): In progress are works for the installation of Inergen cylinders in the Crossover. \u2022 ARETSOU Station: In progress are works for the installation of granite flooring in entrances (surface level) and the execution of SAT&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/23143","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=23143"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/23143\/revisions"}],"predecessor-version":[{"id":29013,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/23143\/revisions\/29013"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/23073"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=23143"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=23143"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=23143"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}