{"id":22306,"date":"2022-02-03T18:38:06","date_gmt":"2022-02-03T15:38:06","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=22306"},"modified":"2024-06-25T11:21:09","modified_gmt":"2024-06-25T08:21:09","slug":"december-2021-2","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=22306&lang=en","title":{"rendered":"December 2021"},"content":{"rendered":"<ul>\n<li><strong>NOMARCHIA Station<\/strong> <strong>(Station and Crossover)<\/strong>: In the area of the crossover, in progress are painting works and works for the installation of the automatic fire fighting system.<\/li>\n<li><strong>ARETSOU Shaft:<\/strong> In progress are works for the installation of collectors for the automatic fire fighting system.<\/li>\n<li><strong>NEA KRINI Station<\/strong>: In progress are works for the installation of stainless steel balustrades and works for the installation of collectors for the automatic fire fighting system.<\/li>\n<li><strong>MICRA<\/strong> <strong>Station (Station and Crossovers)<\/strong><strong>:<\/strong> In the area of the 2<sup>nd<\/sup> Crossover, in progress are surface reinstatement works and works for the installation of sound absorbing panels in the ventilation areas.<\/li>\n<li><strong>TRACKWORK: <\/strong>In progress are works for the installation of electrical trays and their earthing at NOMARCHIA Crossover \u2013 track level. In progress are also the concreting works of the turnout \/ crossover slab R100\/500 in the Forestation area.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>NOMARCHIA Station (Station and Crossover): In the area of the crossover, in progress are painting works and works for the installation of the automatic fire fighting system. ARETSOU Shaft: In progress are works for the installation of collectors for the automatic fire fighting system. NEA KRINI Station: In progress are works for the installation of stainless steel balustrades and works for the installation of collectors for the automatic fire fighting system. MICRA Station (Station and Crossovers): In the area of the 2nd Crossover, in progress are surface reinstatement works and works for the installation of sound absorbing panels in the ventilation areas. TRACKWORK: In progress are works for the installation of electrical trays and their earthing at NOMARCHIA Crossover \u2013 track level. In progress are also the concreting works of the turnout \/ crossover slab R100\/500 in the Forestation area.<\/p>\n","protected":false},"author":4,"featured_media":22268,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[544],"tags":[],"class_list":["post-22306","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kalamaria-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/01\/KALAMARIA_12_21.jpg",1200,1600,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/01\/KALAMARIA_12_21.jpg",1200,1600,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/01\/KALAMARIA_12_21.jpg",1200,1600,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/01\/KALAMARIA_12_21-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/01\/KALAMARIA_12_21-225x300.jpg",225,300,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/01\/KALAMARIA_12_21-768x1024.jpg",768,1024,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/01\/KALAMARIA_12_21-1152x1536.jpg",1152,1536,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/01\/KALAMARIA_12_21.jpg",1200,1600,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/01\/KALAMARIA_12_21-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/01\/KALAMARIA_12_21-1140x1520.jpg",1140,1520,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/01\/KALAMARIA_12_21-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/01\/KALAMARIA_12_21-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2022\/01\/KALAMARIA_12_21-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=544&#038;lang=en\" rel=\"category\">Kalamaria Project progress<\/a>","rttpg_excerpt":"NOMARCHIA Station (Station and Crossover): In the area of the crossover, in progress are painting works and works for the installation of the automatic fire fighting system. ARETSOU Shaft: In progress are works for the installation of collectors for the automatic fire fighting system. NEA KRINI Station: In progress are works for the installation of&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/22306","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=22306"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/22306\/revisions"}],"predecessor-version":[{"id":22307,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/22306\/revisions\/22307"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/22268"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=22306"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=22306"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=22306"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}