{"id":21105,"date":"2021-08-26T16:19:03","date_gmt":"2021-08-26T13:19:03","guid":{"rendered":"https:\/\/www.emetro.gr?p=21105"},"modified":"2024-06-25T11:25:03","modified_gmt":"2024-06-25T08:25:03","slug":"july-2021-3","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=21105&lang=en","title":{"rendered":"July 2021"},"content":{"rendered":"<ul>\n<li><strong>NOMARCHIA<\/strong>\u00a0<strong>Station<\/strong><strong>\u00a0(<\/strong><strong>Station<\/strong><strong>\u00a0&amp;\u00a0<\/strong><strong>Crossover<\/strong><strong>):<\/strong>\u00a0Street-level reinstatement works, works for the installation of stainless steel balustrades and handrails at the entrance staircase and works for the installation of lighting fixtures are in progress. At the crossover, concreting works of the roof slab for closing of the opening and waterproofing works are in progress.<\/li>\n<\/ul>\n<ul>\n<li><strong>KALAMARIA Station<\/strong>: Preliminary works for the implementation of the 10<sup>th<\/sup>\u00a0traffic arrangement and works for the installation of lighting fixtures and tray earthing installation works are in progress<\/li>\n<li><strong>ARETSOU<\/strong>\u00a0<strong>Station<\/strong><strong>:<\/strong>\u00a0Surface reinstatement works, works for the installation of stainless steel balustrades and handrails and works for the installation of the fire-fighting system are in progress.<\/li>\n<\/ul>\n<p><strong>TRACKWORK<\/strong><\/p>\n<p>In progress are works for the installation of the fire-fighting system at the 3<sup>rd<\/sup>\u00a0and 5<sup>th<\/sup>\u00a0interstations of track 1 and in the area of the Forestation. In addition, works for the installation of electrical trays and tray earthing installation works at the 2<sup>nd<\/sup>\u00a0and 3<sup>rd<\/sup>\u00a0interstation, tracks 1 and 2 are in progress.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NOMARCHIA\u00a0Station\u00a0(Station\u00a0&amp;\u00a0Crossover):\u00a0Street-level reinstatement works, works for the installation of stainless steel balustrades and handrails at the entrance staircase and works for the installation of lighting fixtures are in progress. At the crossover, concreting works of the roof slab for closing of the opening and waterproofing works are in progress. KALAMARIA Station: Preliminary works for the implementation of the 10th\u00a0traffic arrangement and works for the installation of lighting fixtures and tray earthing installation works are in progress ARETSOU\u00a0Station:\u00a0Surface reinstatement works, works for the installation of stainless steel balustrades and handrails and works for the installation of the fire-fighting system are in progress. TRACKWORK In progress are works for the installation of the fire-fighting system at the 3rd\u00a0and 5th\u00a0interstations of track 1 and in the area of the Forestation. In addition, works for the installation of electrical trays and tray earthing installation works at the 2nd\u00a0and 3rd\u00a0interstation, tracks 1 and 2 are in progress.<\/p>\n","protected":false},"author":4,"featured_media":20823,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[544],"tags":[],"class_list":["post-21105","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kalamaria-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/08\/KALAMARIA_07_2021.jpg",1199,1460,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/08\/KALAMARIA_07_2021.jpg",1199,1460,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/08\/KALAMARIA_07_2021.jpg",1199,1460,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/08\/KALAMARIA_07_2021-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/08\/KALAMARIA_07_2021-246x300.jpg",246,300,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/08\/KALAMARIA_07_2021-841x1024.jpg",841,1024,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/08\/KALAMARIA_07_2021.jpg",1199,1460,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/08\/KALAMARIA_07_2021.jpg",1199,1460,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/08\/KALAMARIA_07_2021-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/08\/KALAMARIA_07_2021-1140x1388.jpg",1140,1388,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/08\/KALAMARIA_07_2021-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/08\/KALAMARIA_07_2021-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/08\/KALAMARIA_07_2021-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=544&#038;lang=en\" rel=\"category\">Kalamaria Project progress<\/a>","rttpg_excerpt":"NOMARCHIA\u00a0Station\u00a0(Station\u00a0&amp;\u00a0Crossover):\u00a0Street-level reinstatement works, works for the installation of stainless steel balustrades and handrails at the entrance staircase and works for the installation of lighting fixtures are in progress. At the crossover, concreting works of the roof slab for closing of the opening and waterproofing works are in progress. KALAMARIA Station: Preliminary works for the implementation&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/21105","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=21105"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/21105\/revisions"}],"predecessor-version":[{"id":21106,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/21105\/revisions\/21106"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/20823"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=21105"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=21105"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=21105"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}