{"id":21079,"date":"2021-09-24T13:09:55","date_gmt":"2021-09-24T10:09:55","guid":{"rendered":"https:\/\/www.emetro.gr?p=21079"},"modified":"2024-06-25T11:23:27","modified_gmt":"2024-06-25T08:23:27","slug":"august-2021-3","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=21079&lang=en","title":{"rendered":"August 2021"},"content":{"rendered":"<ul>\n<li><strong>KALAMARIA Station<\/strong>: Preliminary works for the implementation of the 10<sup>th<\/sup>\u00a0traffic arrangement and works for the installation of lighting fixtures and tray earthing works are in progress.<\/li>\n<li><strong>NEA KRINI Station<\/strong>: Surface reinstatement works and works for the installation of lighting fixtures and tray earthing works are in progress.<\/li>\n<li><strong>MICRA<\/strong>\u00a0<strong>Station<\/strong><strong>\u00a0(<\/strong><strong>Station<\/strong><strong>\u00a0&amp;\u00a0<\/strong><strong>Crossovers<\/strong><strong>):<\/strong>\u00a0Works for the installation of the fire-fighting system and tray earthing works are in progress.&nbsp;\n<p><strong>TRACKWORK<\/strong><\/p>\n<p>In progress are works for the installation of the fire-fighting system at the 3<sup>rd<\/sup>\u00a0and 5<sup>th<\/sup>\u00a0interstations of track 1 and in the area of the Forestation. In addition, works for the installation of electrical trays and tray earthing works at the 2<sup>nd<\/sup>\u00a0and 3<sup>rd<\/sup>\u00a0interstations, tracks 1 and 2, are in progress<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>KALAMARIA Station: Preliminary works for the implementation of the 10th\u00a0traffic arrangement and works for the installation of lighting fixtures and tray earthing works are in progress. NEA KRINI Station: Surface reinstatement works and works for the installation of lighting fixtures and tray earthing works are in progress. MICRA\u00a0Station\u00a0(Station\u00a0&amp;\u00a0Crossovers):\u00a0Works for the installation of the fire-fighting system and tray earthing works are in progress.&nbsp; TRACKWORK In progress are works for the installation of the fire-fighting system at the 3rd\u00a0and 5th\u00a0interstations of track 1 and in the area of the Forestation. In addition, works for the installation of electrical trays and tray earthing works at the 2nd\u00a0and 3rd\u00a0interstations, tracks 1 and 2, are in progress<\/p>\n","protected":false},"author":4,"featured_media":20957,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[544],"tags":[],"class_list":["post-21079","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kalamaria-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/10\/KALAMARIA_08_2021.jpg",1125,1599,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/10\/KALAMARIA_08_2021.jpg",1125,1599,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/10\/KALAMARIA_08_2021.jpg",1125,1599,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/10\/KALAMARIA_08_2021-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/10\/KALAMARIA_08_2021-211x300.jpg",211,300,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/10\/KALAMARIA_08_2021-720x1024.jpg",720,1024,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/10\/KALAMARIA_08_2021-1081x1536.jpg",1081,1536,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/10\/KALAMARIA_08_2021.jpg",1125,1599,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/10\/KALAMARIA_08_2021-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/10\/KALAMARIA_08_2021.jpg",1125,1599,false],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/10\/KALAMARIA_08_2021-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/10\/KALAMARIA_08_2021-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/10\/KALAMARIA_08_2021-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=544&#038;lang=en\" rel=\"category\">Kalamaria Project progress<\/a>","rttpg_excerpt":"KALAMARIA Station: Preliminary works for the implementation of the 10th\u00a0traffic arrangement and works for the installation of lighting fixtures and tray earthing works are in progress. NEA KRINI Station: Surface reinstatement works and works for the installation of lighting fixtures and tray earthing works are in progress. MICRA\u00a0Station\u00a0(Station\u00a0&amp;\u00a0Crossovers):\u00a0Works for the installation of the fire-fighting system&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/21079","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=21079"}],"version-history":[{"count":2,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/21079\/revisions"}],"predecessor-version":[{"id":21103,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/21079\/revisions\/21103"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/20957"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=21079"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=21079"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=21079"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}