{"id":20810,"date":"2021-06-15T10:23:02","date_gmt":"2021-06-15T07:23:02","guid":{"rendered":"https:\/\/www.emetro.gr?p=20810"},"modified":"2024-06-25T11:27:16","modified_gmt":"2024-06-25T08:27:16","slug":"may-2021-2","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=20810&lang=en","title":{"rendered":"May 2021"},"content":{"rendered":"<ul>\n<li><strong>NOMARCHIA Station (Station and Crossover)<\/strong><strong>:\u00a0<\/strong>In progress are cladding works using fibre-cement boards at the central staircase, as well as works for the installation of the fire fighting network and HVAC system related networks.<\/li>\n<li><strong>KALAMARIA Station<\/strong><strong>:<\/strong>\u00a0In progress are traffic arrangement works, works for the installation of metal frames and glass panels at shops and the atrium, as well as cladding works using fibre-cement boards at the central staircase.<\/li>\n<li><strong>ARETSOU Station:<\/strong>\u00a0In progress are works for the installation of the tunnel ventilation network.<\/li>\n<li><strong>MIKRA Station (Station &amp; Crossover):<\/strong>\u00a0Sewage and fire fighting works are in progress.<\/li>\n<\/ul>\n<p><strong>TRACKWORK:<\/strong>\u00a0In progress are works for the installation of the fire fighting system at the 3<sup>rd<\/sup>\u00a0interstation, tracks 1 &amp; 2, as well as works for the installation of electric trays, at the 2<sup>nd<\/sup>, 3<sup>rd<\/sup>\u00a0and 4<sup>th<\/sup>\u00a0interstations, track 1.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NOMARCHIA Station (Station and Crossover):\u00a0In progress are cladding works using fibre-cement boards at the central staircase, as well as works for the installation of the fire fighting network and HVAC system related networks. KALAMARIA Station:\u00a0In progress are traffic arrangement works, works for the installation of metal frames and glass panels at shops and the atrium, as well as cladding works using fibre-cement boards at the central staircase. ARETSOU Station:\u00a0In progress are works for the installation of the tunnel ventilation network. MIKRA Station (Station &amp; Crossover):\u00a0Sewage and fire fighting works are in progress. TRACKWORK:\u00a0In progress are works for the installation of the fire fighting system at the 3rd\u00a0interstation, tracks 1 &amp; 2, as well as works for the installation of electric trays, at the 2nd, 3rd\u00a0and 4th\u00a0interstations, track 1.<\/p>\n","protected":false},"author":4,"featured_media":20811,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[544],"tags":[],"class_list":["post-20810","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kalamaria-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/06\/KALAMARIA_05_2021.jpg",1196,1345,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/06\/KALAMARIA_05_2021.jpg",1196,1345,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/06\/KALAMARIA_05_2021.jpg",1196,1345,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/06\/KALAMARIA_05_2021-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/06\/KALAMARIA_05_2021-267x300.jpg",267,300,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/06\/KALAMARIA_05_2021-911x1024.jpg",911,1024,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/06\/KALAMARIA_05_2021.jpg",1196,1345,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/06\/KALAMARIA_05_2021.jpg",1196,1345,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/06\/KALAMARIA_05_2021-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/06\/KALAMARIA_05_2021-1140x1282.jpg",1140,1282,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/06\/KALAMARIA_05_2021-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/06\/KALAMARIA_05_2021-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/06\/KALAMARIA_05_2021-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=544&#038;lang=en\" rel=\"category\">Kalamaria Project progress<\/a>","rttpg_excerpt":"NOMARCHIA Station (Station and Crossover):\u00a0In progress are cladding works using fibre-cement boards at the central staircase, as well as works for the installation of the fire fighting network and HVAC system related networks. KALAMARIA Station:\u00a0In progress are traffic arrangement works, works for the installation of metal frames and glass panels at shops and the atrium,&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/20810","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=20810"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/20810\/revisions"}],"predecessor-version":[{"id":20812,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/20810\/revisions\/20812"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/20811"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=20810"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=20810"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=20810"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}