{"id":17831,"date":"2021-05-13T10:08:01","date_gmt":"2021-05-13T07:08:01","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=17831"},"modified":"2024-06-25T11:28:16","modified_gmt":"2024-06-25T08:28:16","slug":"april-2021-3","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=17831&lang=en","title":{"rendered":"April 2021"},"content":{"rendered":"<p>&nbsp;<\/p>\n<ul>\n<li><strong>NOMARCHIA Station (Station and Crossover)<\/strong><strong>: <\/strong>Reinstatement related works at street level are in progress.<\/li>\n<li><strong>KALAMARIA Station<\/strong><strong>:<\/strong> In progress are works for the installation of special side glass panel items for sheds, as well as reinstatement related works at street level.<\/li>\n<li><strong>ARETSOU Station:<\/strong> In progress are surface reinstatement related works.<\/li>\n<li><strong>MIKRA Station (Station &amp; Crossover):<\/strong> At the station and the 1<sup>st<\/sup> crossover, in progress are surface reinstatement works and works for the installation of water supply equipment.<\/li>\n<\/ul>\n<p><strong>TRACKWORK:<\/strong> In progress are works for the installation of precast ducts at track 1 and track 2, from K.P. 0+091 up to the Forestation, as well as works for the installation of fire fighting equipment at the 5<sup>th<\/sup> interstation, track 1, and at the 4<sup>th<\/sup> interstation, tracks 1 and 2.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; NOMARCHIA Station (Station and Crossover): Reinstatement related works at street level are in progress. KALAMARIA Station: In progress are works for the installation of special side glass panel items for sheds, as well as reinstatement related works at street level. ARETSOU Station: In progress are surface reinstatement related works. MIKRA Station (Station &amp; Crossover): At the station and the 1st crossover, in progress are surface reinstatement works and works for the installation of water supply equipment. TRACKWORK: In progress are works for the installation of precast ducts at track 1 and track 2, from K.P. 0+091 up to the Forestation, as well as works for the installation of fire fighting equipment at the 5th interstation, track 1, and at the 4th interstation, tracks 1 and 2.<\/p>\n","protected":false},"author":4,"featured_media":17779,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[544],"tags":[],"class_list":["post-17831","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kalamaria-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/05\/KALAMARIA_04_2021.jpg",1194,1476,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/05\/KALAMARIA_04_2021.jpg",1194,1476,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/05\/KALAMARIA_04_2021.jpg",1194,1476,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/05\/KALAMARIA_04_2021-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/05\/KALAMARIA_04_2021-243x300.jpg",243,300,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/05\/KALAMARIA_04_2021-828x1024.jpg",828,1024,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/05\/KALAMARIA_04_2021.jpg",1194,1476,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/05\/KALAMARIA_04_2021.jpg",1194,1476,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/05\/KALAMARIA_04_2021-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/05\/KALAMARIA_04_2021-1140x1409.jpg",1140,1409,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/05\/KALAMARIA_04_2021-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/05\/KALAMARIA_04_2021-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/05\/KALAMARIA_04_2021-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=544&#038;lang=en\" rel=\"category\">Kalamaria Project progress<\/a>","rttpg_excerpt":"&nbsp; NOMARCHIA Station (Station and Crossover): Reinstatement related works at street level are in progress. KALAMARIA Station: In progress are works for the installation of special side glass panel items for sheds, as well as reinstatement related works at street level. ARETSOU Station: In progress are surface reinstatement related works. MIKRA Station (Station &amp; Crossover):&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/17831","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=17831"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/17831\/revisions"}],"predecessor-version":[{"id":19702,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/17831\/revisions\/19702"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/17779"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=17831"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=17831"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=17831"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}