{"id":17717,"date":"2021-03-12T12:51:54","date_gmt":"2021-03-12T10:51:54","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=17717"},"modified":"2024-06-25T11:30:10","modified_gmt":"2024-06-25T08:30:10","slug":"february-2021-3","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=17717&lang=en","title":{"rendered":"February 2021"},"content":{"rendered":"<p>&nbsp;<\/p>\n<ul>\n<li><strong>NOMARCHIA Station (Station and Crossover)<\/strong><strong>: <\/strong>Remaining floor paving works, as well as works for the installation of galvanized balustrades are in progress.<\/li>\n<li><strong>KALAMARIA Station<\/strong><strong>:<\/strong> In progress are reinstatement works at street level and works for the installation of glass panels at the sheds of the eastern and western entrance.<\/li>\n<\/ul>\n<p><strong>TRACKWORK:<\/strong> Concreting works at tracks 1 and 2 from KALAMARIA Station up to Nomarchia Crossover have been completed, while in progress are works for the installation of precast ducts from K.P. 2+800 up to the Forestation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; NOMARCHIA Station (Station and Crossover): Remaining floor paving works, as well as works for the installation of galvanized balustrades are in progress. KALAMARIA Station: In progress are reinstatement works at street level and works for the installation of glass panels at the sheds of the eastern and western entrance. TRACKWORK: Concreting works at tracks 1 and 2 from KALAMARIA Station up to Nomarchia Crossover have been completed, while in progress are works for the installation of precast ducts from K.P. 2+800 up to the Forestation.<\/p>\n","protected":false},"author":4,"featured_media":17662,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[544],"tags":[],"class_list":["post-17717","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kalamaria-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/KALAMARIA_02_21.jpg",1199,1373,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/KALAMARIA_02_21.jpg",1199,1373,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/KALAMARIA_02_21.jpg",1199,1373,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/KALAMARIA_02_21-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/KALAMARIA_02_21-262x300.jpg",262,300,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/KALAMARIA_02_21-894x1024.jpg",894,1024,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/KALAMARIA_02_21.jpg",1199,1373,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/KALAMARIA_02_21.jpg",1199,1373,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/KALAMARIA_02_21-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/KALAMARIA_02_21-1140x1305.jpg",1140,1305,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/KALAMARIA_02_21-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/KALAMARIA_02_21-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/KALAMARIA_02_21-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=544&#038;lang=en\" rel=\"category\">Kalamaria Project progress<\/a>","rttpg_excerpt":"&nbsp; NOMARCHIA Station (Station and Crossover): Remaining floor paving works, as well as works for the installation of galvanized balustrades are in progress. KALAMARIA Station: In progress are reinstatement works at street level and works for the installation of glass panels at the sheds of the eastern and western entrance. TRACKWORK: Concreting works at tracks&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/17717","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=17717"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/17717\/revisions"}],"predecessor-version":[{"id":19706,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/17717\/revisions\/19706"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/17662"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=17717"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=17717"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=17717"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}