{"id":17715,"date":"2021-03-12T12:44:53","date_gmt":"2021-03-12T10:44:53","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=17715"},"modified":"2024-06-25T11:30:32","modified_gmt":"2024-06-25T08:30:32","slug":"february-2021-2","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=17715&lang=en","title":{"rendered":"February 2021"},"content":{"rendered":"<p>&nbsp;<\/p>\n<ul>\n<li><strong>New Railway Station:<\/strong> Works for the installation of cable trays at the signaling and telecommunications technical rooms are in progress.<\/li>\n<li><strong>DIMOKRATIAS STATION: <\/strong>Works related to the installation of the air duct networks at level -1 are in progress.<\/li>\n<li><strong>VENIZELOU Station:<\/strong> Archaeological excavations are in progress at the southern entrance.<\/li>\n<li><strong>SINTRIVANI <\/strong><strong>Station (Station and Crossover):<\/strong> The works for the installation of the data communication system are in progress, while works for the concreting of the temporary openings (eastern and western) at level -3 are at a completion stage.<\/li>\n<li><strong>PANEPISTIMIO Station:<\/strong> Cabling works\/ works for connection of the platform screen doors control panels are in progress.<\/li>\n<li><strong>PAPAFI Station:<\/strong> Works for the construction of the guard\u2019s house at Papafio Institution and works for the installation of cables at the signaling equipment technical room are in progress.<\/li>\n<li><strong>EFKLIDIS Station: <\/strong>The works for the construction of platform filling concrete have been completed, while works for the closing of the temporary opening of the station are in progress.<\/li>\n<li><strong>FLEMING Station: <\/strong>The works for the construction of the sound insulation at the ventilation shafts and the works for the closing of the temporary opening of the roof slab are in progress.<\/li>\n<li><strong>ANALIPSI Station: <\/strong>The works for the installation of fire-rated air ducts (OTE\/SAF) at track 2 level have been completed, while works for the installation of platform screen doors, lighting cables and air ducts for the ventilation\/air conditioning system are in progress.<\/li>\n<li><strong>25 MARTIOU Station:<\/strong> The works for the installation of the lighting system are in progress.<\/li>\n<li><strong>NEA ELVETIA Station: <\/strong>The works for the installation of the ventilation\/air conditioning system equipment and the outdoor lift are in progress.<\/li>\n<\/ul>\n<p><strong>DEPOT<\/strong><\/p>\n<p><strong>Building<\/strong> <strong>Complex<\/strong> <strong>\u0399<\/strong><strong>: <\/strong>In progress are building works for the installation of panels and cable trays at level +69.00.<\/p>\n<p><strong>Building<\/strong> <strong>Complex<\/strong> <strong>\u0399\u0399<\/strong><strong>: <\/strong>In progress are works for the installation of fire-rated glass-panes and gypsum boards in the control center area, as well as works for the insulation of air conditioning ducts at level +66.40, the installation of a fire-detection system at level +58.00 of the control center, and the installation of cable trays at level +61.40.<\/p>\n<p><strong>TRACKWORK: <\/strong>The works for the construction of the double crossover in Nea Elvetia crossover and the works for the construction of the floating slab\/turnover 26-27 at the tunnel leading to the Depot are in progress.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; New Railway Station: Works for the installation of cable trays at the signaling and telecommunications technical rooms are in progress. DIMOKRATIAS STATION: Works related to the installation of the air duct networks at level -1 are in progress. VENIZELOU Station: Archaeological excavations are in progress at the southern entrance. SINTRIVANI Station (Station and Crossover): The works for the installation of the data communication system are in progress, while works for the concreting of the temporary openings (eastern and western) at level -3 are at a completion stage. PANEPISTIMIO Station: Cabling works\/ works for connection of the platform screen doors control panels are in progress. PAPAFI Station: Works for the construction of the guard\u2019s house at Papafio Institution and works for the installation of cables at the signaling equipment technical room are in progress. EFKLIDIS Station: The works for the construction of platform filling concrete have been completed, while works for the closing of the temporary opening of the station are in progress. FLEMING Station: The works for the construction of the sound insulation at the ventilation shafts and the works for the closing of the temporary opening of the roof slab are in progress. ANALIPSI Station: The works for the installation of fire-rated air ducts (OTE\/SAF) at track 2 level have been completed, while works for the installation of platform screen doors, lighting cables and air ducts for the ventilation\/air conditioning system are in progress. 25 MARTIOU Station: The works for the installation of the lighting system are in progress. NEA ELVETIA Station: The works for the installation of the ventilation\/air conditioning system equipment and the outdoor lift are in progress. DEPOT Building Complex \u0399: In progress are building works for the installation of panels and cable trays at level +69.00. Building Complex \u0399\u0399: In progress are works for the installation of fire-rated glass-panes and gypsum boards in the control center area, as well as works for the insulation of air conditioning ducts at level +66.40, the installation of a fire-detection system at level +58.00 of the control center, and the installation of cable trays at level +61.40. TRACKWORK: The works for the construction of the double crossover in Nea Elvetia crossover and the works for the construction of the floating slab\/turnover 26-27 at the tunnel leading to the Depot are in progress.<\/p>\n","protected":false},"author":4,"featured_media":17658,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[79],"tags":[],"class_list":["post-17715","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-thessaloniki-base-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/Thessaloniki_02_21.jpg",1599,1070,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/Thessaloniki_02_21.jpg",1599,1070,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/Thessaloniki_02_21.jpg",1599,1070,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/Thessaloniki_02_21-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/Thessaloniki_02_21-300x201.jpg",300,201,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/Thessaloniki_02_21-1024x685.jpg",960,642,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/Thessaloniki_02_21-1536x1028.jpg",1536,1028,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/Thessaloniki_02_21.jpg",1599,1070,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/Thessaloniki_02_21-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/Thessaloniki_02_21-1140x763.jpg",1140,763,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/Thessaloniki_02_21-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/Thessaloniki_02_21-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/03\/Thessaloniki_02_21-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=79&#038;lang=en\" rel=\"category\">Thessaloniki Base Project progress<\/a>","rttpg_excerpt":"&nbsp; New Railway Station: Works for the installation of cable trays at the signaling and telecommunications technical rooms are in progress. DIMOKRATIAS STATION: Works related to the installation of the air duct networks at level -1 are in progress. VENIZELOU Station: Archaeological excavations are in progress at the southern entrance. SINTRIVANI Station (Station and Crossover):&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/17715","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=17715"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/17715\/revisions"}],"predecessor-version":[{"id":19707,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/17715\/revisions\/19707"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/17658"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=17715"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=17715"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=17715"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}