{"id":17615,"date":"2021-02-12T12:01:51","date_gmt":"2021-02-12T10:01:51","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=17615"},"modified":"2024-06-25T11:31:26","modified_gmt":"2024-06-25T08:31:26","slug":"january-2021","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=17615&lang=en","title":{"rendered":"January 2021"},"content":{"rendered":"<p>&nbsp;<\/p>\n<ul>\n<li><strong>NOMARCHIA Station (Station and Crossover)<\/strong><strong>: <\/strong>Reinstatement related works at street level, as well as works for the installation of galvanized balustrades are in progress.<\/li>\n<li><strong>KALAMARIA Station<\/strong><strong>:<\/strong> In progress are works for the installation of glass panels of the sheds at the west entrance, as well as works for the installation of cabling for the lighting networks.<\/li>\n<li><strong>NEA KRINI Station<\/strong><strong>:<\/strong> In progress are works for the installation of the fire fighting system.<\/li>\n<\/ul>\n<p><strong>TRACKWORK:<\/strong> Concreting works at tracks 1 and 2 from K.P. 2+800 to KALAMARIA Station have been completed, while in progress are the respective works at tracks 1 and 2 from KALAMARIA Station to NOMARCHIA Crossover.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; NOMARCHIA Station (Station and Crossover): Reinstatement related works at street level, as well as works for the installation of galvanized balustrades are in progress. KALAMARIA Station: In progress are works for the installation of glass panels of the sheds at the west entrance, as well as works for the installation of cabling for the lighting networks. NEA KRINI Station: In progress are works for the installation of the fire fighting system. TRACKWORK: Concreting works at tracks 1 and 2 from K.P. 2+800 to KALAMARIA Station have been completed, while in progress are the respective works at tracks 1 and 2 from KALAMARIA Station to NOMARCHIA Crossover.<\/p>\n","protected":false},"author":4,"featured_media":17613,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[544],"tags":[],"class_list":["post-17615","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kalamaria-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/02\/KALAMARIA_01_21.jpg",1199,1465,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/02\/KALAMARIA_01_21.jpg",1199,1465,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/02\/KALAMARIA_01_21.jpg",1199,1465,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/02\/KALAMARIA_01_21-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/02\/KALAMARIA_01_21-246x300.jpg",246,300,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/02\/KALAMARIA_01_21-838x1024.jpg",838,1024,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/02\/KALAMARIA_01_21.jpg",1199,1465,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/02\/KALAMARIA_01_21.jpg",1199,1465,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/02\/KALAMARIA_01_21-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/02\/KALAMARIA_01_21-1140x1393.jpg",1140,1393,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/02\/KALAMARIA_01_21-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/02\/KALAMARIA_01_21-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/02\/KALAMARIA_01_21-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=544&#038;lang=en\" rel=\"category\">Kalamaria Project progress<\/a>","rttpg_excerpt":"&nbsp; NOMARCHIA Station (Station and Crossover): Reinstatement related works at street level, as well as works for the installation of galvanized balustrades are in progress. KALAMARIA Station: In progress are works for the installation of glass panels of the sheds at the west entrance, as well as works for the installation of cabling for the&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/17615","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=17615"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/17615\/revisions"}],"predecessor-version":[{"id":19709,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/17615\/revisions\/19709"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/17613"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=17615"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=17615"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=17615"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}