{"id":17528,"date":"2021-01-21T15:33:50","date_gmt":"2021-01-21T13:33:50","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=17528"},"modified":"2024-06-25T13:40:58","modified_gmt":"2024-06-25T10:40:58","slug":"december-2020-3","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=17528&lang=en","title":{"rendered":"DECEMBER 2020"},"content":{"rendered":"<p>&nbsp;<\/p>\n<p><strong><u>MANIATIKA STATION <\/u><\/strong><\/p>\n<p><strong><u>STATION\u2019s OPEN CUT <\/u><\/strong><\/p>\n<p><strong>The following works have been completed:<\/strong><\/p>\n<ul>\n<li>Waterproofing of perimeter walls<\/li>\n<li>Permanent lining of the foundation (level -4)<\/li>\n<li>Permanent lining of E\/M slab (level -3)<\/li>\n<li>Permanent lining of the concourse slab (level -2)<\/li>\n<li>Permanent lining of staircace S4<\/li>\n<li>Permanent lining of E\/M slab (level -1)<\/li>\n<li>Permanent lining of perimeter walls and columns<\/li>\n<li>Permanent lining of the roof slab and staircase S3<\/li>\n<li>Construction of perimeter walls of the station\u2019s main entrance (at street level) and of the inclined part of the main entrance (shed).<\/li>\n<\/ul>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Waterproofing of the roof slab<\/li>\n<li>Construction of and plastering of masonry walls at levels -4,<\/li>\n<\/ul>\n<p>-3, -2 and -1.<\/p>\n<ul>\n<li>Architectural finishes \u2013 Painting works at level -4<\/li>\n<li>Industrial flooring at levels -3, -2<\/li>\n<li>Construction of permanent lining of the east lift of the station<\/li>\n<\/ul>\n<p><strong><u>MAIN TUNNEL OF THE STATION<\/u><\/strong><strong><u> (<\/u><\/strong><strong><u>\u039d\u0391\u03a4\u039c<\/u><\/strong><strong><u>)<\/u><\/strong><\/p>\n<p><strong>The following works have been completed:<\/strong><\/p>\n<ul>\n<li>Permanent lining of the station\u2019s main tunnel<\/li>\n<li>Permanent lining of the deepening area<\/li>\n<li>Permanent lining of the northern and southern headwall<\/li>\n<li>Construction of parapet walls and platform slabs<\/li>\n<li>Secondary grouting of the vault of the main station tunnel<\/li>\n<li>Filling of platform ducts with non-reinforced concrete.<\/li>\n<\/ul>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Repair works of the station\u2019s concrete vault and painting works at level -5.<\/li>\n<\/ul>\n<p><strong><u>PIRAEUS STATION\u00a0 <\/u><\/strong><\/p>\n<p><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Waterproofing works underneath the foundation<\/li>\n<li>Concreting of the foundation slab and placing of non-reinforced concrete over the foundation.<\/li>\n<li>Concreting of platforms and vertical elements underneath the platforms.<\/li>\n<\/ul>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Installation of waterproofing at the station\u2019s perimeter walls<\/li>\n<li>Concreting of the station\u2019s perimeter walls<\/li>\n<li>Removal of struts and walers of the 1<sup>st <\/sup>row<\/li>\n<li>Installation of formwork, reinforcement and concreting of the roof slab<\/li>\n<li>Commencement of architectural finishes \u2013 construction of masonry walls<\/li>\n<li>Concreting of interior walls and columns<\/li>\n<\/ul>\n<p><strong><u>ROLOI SHAFT<\/u><\/strong><\/p>\n<p><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Construction of foundation and permanent lining of perimeter walls (still pending is the termination at street level).<\/li>\n<\/ul>\n<p><strong><u>NATM ACCESS TUNNEL <\/u><\/strong><\/p>\n<p><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Concreting of the permanent lining.<\/li>\n<\/ul>\n<p><strong><u>DIMOTIKO THEATRO STATION <\/u><\/strong><\/p>\n<p><strong><u>MAIN STATION \u2013 AGHIOU KONSTANTINOU SQUARE <\/u><\/strong><\/p>\n<p><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Sealing of the temporary pumping station.<\/li>\n<\/ul>\n<p><strong>The following works are put on hold: <\/strong><\/p>\n<ul>\n<li>Installation of doors at E\/M level.<\/li>\n<\/ul>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Cleaning works<\/li>\n<li>Cement mortar laying works at the platform and ticketing levels<\/li>\n<li>Conservation of the archaeological finds of the Project.<\/li>\n<\/ul>\n<p><strong><u>UNDERGROUND PART OF THE STATION <\/u><\/strong><\/p>\n<p><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Concreting of the permanent lining, walls and platform slab.<\/li>\n<\/ul>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Cement mortar laying works at the platform level.<\/li>\n<\/ul>\n<p><strong>\u00a0<\/strong><strong><u>STAIRCASE GALLERIES <\/u><\/strong><\/p>\n<p><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Concreting of the permanent lining and works related to secondary concreting.<\/li>\n<\/ul>\n<p><strong><u>KORAI SQUARE<\/u><\/strong><strong><u> ENTRANCE AND ACCESS GALLERY <\/u><\/strong><\/p>\n<p><strong>\u00a0<\/strong><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Concreting of the permanent lining, secondary concrete and waterproofing.<\/li>\n<\/ul>\n<p><strong><u>BAKOYIANNI SQUARE ENTRANCE AND ACCESS GALLERY <\/u><\/strong><\/p>\n<p><strong>\u00a0<\/strong><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Waterproofing and concreting of the permanent lining (still pending is the waterproofing detail at the terminating point, at street level)<\/li>\n<li>Secondary concrete at the staircases.<\/li>\n<\/ul>\n<p><strong>The following works are put on hold: <\/strong><\/p>\n<ul>\n<li>Secondary concrete at the access gallery.<\/li>\n<li>Backfilling \u2013 compaction related works.<\/li>\n<\/ul>\n<p><strong>\u00a0<\/strong><strong><u>DELIGIANNI SHAFT<\/u><\/strong><\/p>\n<p><strong>\u00a0<\/strong><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Excavation and temporary retaining up to the final level<\/li>\n<li>Waterproofing, construction of foundation slab and perimeter walls down to -3.0.<\/li>\n<\/ul>\n<p><strong>\u00a0<\/strong><strong><u>PANEPISTIMIO SHAFT &amp; VENTILATION TUNNEL <\/u><\/strong><\/p>\n<p><strong>\u00a0<\/strong><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Excavation &#8211; temporary retaining<\/li>\n<li>Concreting of the foundation of the shaft\u2019s permanent lining<\/li>\n<li>Concreting of the permanent lining of the connecting tunnel.<\/li>\n<\/ul>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Preparatory works for the metalwork of the perimeters walls<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; MANIATIKA STATION STATION\u2019s OPEN CUT The following works have been completed: Waterproofing of perimeter walls Permanent lining of the foundation (level -4) Permanent lining of E\/M slab (level -3) Permanent lining of the concourse slab (level -2) Permanent lining of staircace S4 Permanent lining of E\/M slab (level -1) Permanent lining of perimeter walls and columns Permanent lining of the roof slab and staircase S3 Construction of perimeter walls of the station\u2019s main entrance (at street level) and of the inclined part of the main entrance (shed). The following works are in progress: Waterproofing of the roof slab Construction of and plastering of masonry walls at levels -4, -3, -2 and -1. Architectural finishes \u2013 Painting works at level -4 Industrial flooring at levels -3, -2 Construction of permanent lining of the east lift of the station MAIN TUNNEL OF THE STATION (\u039d\u0391\u03a4\u039c) The following works have been completed: Permanent lining of the station\u2019s main tunnel Permanent lining of the deepening area Permanent lining of the northern and southern headwall Construction of parapet walls and platform slabs Secondary grouting of the vault of the main station tunnel Filling of platform ducts with non-reinforced concrete. The following works are in progress: Repair works of the station\u2019s concrete vault and painting works at level -5. PIRAEUS STATION\u00a0 The following works have been completed: Waterproofing works underneath the foundation Concreting of the foundation slab and placing of non-reinforced concrete over the foundation. Concreting of platforms and vertical elements underneath the platforms. The following works are in progress: Installation of waterproofing at the station\u2019s perimeter walls Concreting of the station\u2019s perimeter walls Removal of struts and walers of the 1st row Installation of formwork, reinforcement and concreting of the roof slab Commencement of architectural finishes \u2013 construction of masonry walls Concreting of interior walls and columns ROLOI SHAFT The following works have been completed: Construction of foundation and permanent lining of perimeter walls (still pending is the termination at street level). NATM ACCESS TUNNEL The following works have been completed: Concreting of the permanent lining. DIMOTIKO THEATRO STATION MAIN STATION \u2013 AGHIOU KONSTANTINOU SQUARE The following works have been completed: Sealing of the temporary pumping station. The following works are put on hold: Installation of doors at E\/M level. The following works are in progress: Cleaning works Cement mortar laying works at the platform and ticketing levels Conservation of the archaeological finds of the Project. UNDERGROUND PART OF THE STATION The following works have been completed: Concreting of the permanent lining, walls and platform slab. The following works are in progress: Cement mortar laying works at the platform level. \u00a0STAIRCASE GALLERIES The following works have been completed: Concreting of the permanent lining and works related to secondary concreting. KORAI SQUARE ENTRANCE AND ACCESS GALLERY \u00a0The following works have been completed: Concreting of the permanent lining, secondary concrete and waterproofing. BAKOYIANNI SQUARE ENTRANCE AND ACCESS GALLERY \u00a0The following works have been completed: Waterproofing and concreting of the permanent lining (still pending is the waterproofing detail at the terminating point, at street level) Secondary concrete at the staircases. The following works are put on hold: Secondary concrete at the access gallery. Backfilling \u2013 compaction related works. \u00a0DELIGIANNI SHAFT \u00a0The following works have been completed: Excavation and temporary retaining up to the final level Waterproofing, construction of foundation slab and perimeter walls down to -3.0. \u00a0PANEPISTIMIO SHAFT &amp; VENTILATION TUNNEL \u00a0The following works have been completed: Excavation &#8211; temporary retaining Concreting of the foundation of the shaft\u2019s permanent lining Concreting of the permanent lining of the connecting tunnel. The following works are in progress: Preparatory works for the metalwork of the perimeters walls<\/p>\n","protected":false},"author":12,"featured_media":16748,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[78],"tags":[],"class_list":["post-17528","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-peiraias-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-9-1.jpg",1024,683,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-9-1.jpg",1024,683,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-9-1.jpg",1024,683,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-9-1-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-9-1-300x200.jpg",300,200,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-9-1.jpg",960,640,false],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-9-1.jpg",1024,683,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-9-1.jpg",1024,683,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-9-1-1024x540.jpg",1024,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-9-1.jpg",1024,683,false],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-9-1-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-9-1-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-9-1-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"kkatri","author_link":"https:\/\/www.emetro.gr\/?author=12"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=78&#038;lang=en\" rel=\"category\">Piraeus Project progress<\/a>","rttpg_excerpt":"&nbsp; MANIATIKA STATION STATION\u2019s OPEN CUT The following works have been completed: Waterproofing of perimeter walls Permanent lining of the foundation (level -4) Permanent lining of E\/M slab (level -3) Permanent lining of the concourse slab (level -2) Permanent lining of staircace S4 Permanent lining of E\/M slab (level -1) Permanent lining of perimeter walls&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/17528","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=17528"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/17528\/revisions"}],"predecessor-version":[{"id":19711,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/17528\/revisions\/19711"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/16748"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=17528"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=17528"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=17528"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}