{"id":17521,"date":"2021-01-15T13:19:40","date_gmt":"2021-01-15T11:19:40","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=17521"},"modified":"2024-06-25T11:32:18","modified_gmt":"2024-06-25T08:32:18","slug":"december-2020","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=17521&lang=en","title":{"rendered":"December 2020"},"content":{"rendered":"<p>&nbsp;<\/p>\n<ul>\n<li><strong>Kritis Shaft<\/strong><strong>: <\/strong>Reinstatement related works at street level, painting works and works related to the completion of door installation are in progress.<\/li>\n<li><strong>KALAMARIA Station<\/strong><strong>:<\/strong> In progress are reinstatement related works at street level, as well as works for the installation of glass panels of the sheds at the east entrance.<\/li>\n<li><strong>ARETSOU Station<\/strong><strong>:<\/strong> In progress are works for the installation of trays, as well as works for the installation of cabling for the lighting networks.<\/li>\n<li><strong>MIKRA<\/strong> <strong>Station<\/strong><strong>:<\/strong> Surface reinstatement works are in progress.<\/li>\n<\/ul>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>TRACKWORK:<\/strong> Concreting works at tracks 1 and 2, from K.P. 0+091 to Nomarchia Crossover have been completed, while in progress are the respective works at tracks 1 and 2, from K.P. 2+800 to KALAMARIA Station.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; Kritis Shaft: Reinstatement related works at street level, painting works and works related to the completion of door installation are in progress. KALAMARIA Station: In progress are reinstatement related works at street level, as well as works for the installation of glass panels of the sheds at the east entrance. ARETSOU Station: In progress are works for the installation of trays, as well as works for the installation of cabling for the lighting networks. MIKRA Station: Surface reinstatement works are in progress. \u00a0 TRACKWORK: Concreting works at tracks 1 and 2, from K.P. 0+091 to Nomarchia Crossover have been completed, while in progress are the respective works at tracks 1 and 2, from K.P. 2+800 to KALAMARIA Station.<\/p>\n","protected":false},"author":4,"featured_media":17519,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[544],"tags":[],"class_list":["post-17521","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kalamaria-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/01\/KALAMARIA_12_20_1-scaled-1.jpg",2560,2276,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/01\/KALAMARIA_12_20_1-scaled-1.jpg",2560,2276,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/01\/KALAMARIA_12_20_1-scaled-1.jpg",2560,2276,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/01\/KALAMARIA_12_20_1-scaled-1-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/01\/KALAMARIA_12_20_1-scaled-1-300x267.jpg",300,267,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/01\/KALAMARIA_12_20_1-scaled-1-1024x910.jpg",960,853,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/01\/KALAMARIA_12_20_1-scaled-1-1536x1366.jpg",1536,1366,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/01\/KALAMARIA_12_20_1-scaled-1-2048x1821.jpg",2048,1821,true],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/01\/KALAMARIA_12_20_1-scaled-1-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/01\/KALAMARIA_12_20_1-scaled-1-1140x1014.jpg",1140,1014,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/01\/KALAMARIA_12_20_1-scaled-1-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/01\/KALAMARIA_12_20_1-scaled-1-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2021\/01\/KALAMARIA_12_20_1-scaled-1-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=544&#038;lang=en\" rel=\"category\">Kalamaria Project progress<\/a>","rttpg_excerpt":"&nbsp; Kritis Shaft: Reinstatement related works at street level, painting works and works related to the completion of door installation are in progress. KALAMARIA Station: In progress are reinstatement related works at street level, as well as works for the installation of glass panels of the sheds at the east entrance. ARETSOU Station: In progress&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/17521","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=17521"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/17521\/revisions"}],"predecessor-version":[{"id":19712,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/17521\/revisions\/19712"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/17519"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=17521"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=17521"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=17521"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}