{"id":17504,"date":"2020-12-10T12:13:30","date_gmt":"2020-12-10T10:13:30","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=17504"},"modified":"2024-06-25T11:33:39","modified_gmt":"2024-06-25T08:33:39","slug":"november-2020-2","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=17504&lang=en","title":{"rendered":"November 2020"},"content":{"rendered":"<p>&nbsp;<\/p>\n<ul>\n<li><strong>DIMOKRATIAS Station:<\/strong> In progress are works for the installation of the air duct network at level -2.<\/li>\n<li><strong>VENIZELOU Station:<\/strong> Diaphragm walls construction works at the southern access, as well as works related to roof slab supporting piles have been completed.<\/li>\n<li><strong>AGHIA SOFIA Station:<\/strong> Works for the construction of parapet walls\u2019 terminations at the south access are in progress.<\/li>\n<li><strong>FLEMING Station:<\/strong> In progress are works at the installation of Uninterrupted Power Supply (UPS) equipment for the telecommunications and signaling systems.<\/li>\n<li><strong>ANALIPSI Station:<\/strong> Works for the installation of traction power supply related equipment and cabling are in progress.<\/li>\n<li><strong>25 MARTIOU Station:<\/strong> The works for the installation of fire-rated air ducts (OTE\/SAF) at track level have been completed, while the works for the installation of platform screen doors are in progress.<\/li>\n<li><strong>VOULGARI Station:<\/strong> In progress are works for the installation of cable trays, as well as waterproofing and painting related works of the station\u2019s pumping station.<\/li>\n<\/ul>\n<p><strong>DEPOT<\/strong><br \/>\n<strong>Building Complex \u0399:<\/strong> In progress are works for the installation of cable trays at level +74.00 and works for the installation of the lighting system at level +63.50.<br \/>\n<strong>Building Complex \u0399\u0399:<\/strong> In progress are works for the installation of fire detection networks at level +53.00, the installation of the lighting system at levels +52.00 and +58.00, as well as false ceilings\u2019 construction works at level +52.00 of section V.<\/p>\n<p><strong>TRACKWORK:<\/strong><br \/>\nThe works for the construction of the floating slab of track 1 between SINTRIVANI and PANEPISTIMIO Stations have been completed. Moreover, in progress are alignment works and works for the installation of signalling equipment between SINTRIVANI and FLEMING Stations.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; DIMOKRATIAS Station: In progress are works for the installation of the air duct network at level -2. VENIZELOU Station: Diaphragm walls construction works at the southern access, as well as works related to roof slab supporting piles have been completed. AGHIA SOFIA Station: Works for the construction of parapet walls\u2019 terminations at the south access are in progress. FLEMING Station: In progress are works at the installation of Uninterrupted Power Supply (UPS) equipment for the telecommunications and signaling systems. ANALIPSI Station: Works for the installation of traction power supply related equipment and cabling are in progress. 25 MARTIOU Station: The works for the installation of fire-rated air ducts (OTE\/SAF) at track level have been completed, while the works for the installation of platform screen doors are in progress. VOULGARI Station: In progress are works for the installation of cable trays, as well as waterproofing and painting related works of the station\u2019s pumping station. DEPOT Building Complex \u0399: In progress are works for the installation of cable trays at level +74.00 and works for the installation of the lighting system at level +63.50. Building Complex \u0399\u0399: In progress are works for the installation of fire detection networks at level +53.00, the installation of the lighting system at levels +52.00 and +58.00, as well as false ceilings\u2019 construction works at level +52.00 of section V. TRACKWORK: The works for the construction of the floating slab of track 1 between SINTRIVANI and PANEPISTIMIO Stations have been completed. Moreover, in progress are alignment works and works for the installation of signalling equipment between SINTRIVANI and FLEMING Stations.<\/p>\n","protected":false},"author":4,"featured_media":17478,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[79],"tags":[],"class_list":["post-17504","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-thessaloniki-base-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/12\/THESSALONIKI_11_20-scaled-1.jpg",1917,2560,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/12\/THESSALONIKI_11_20-scaled-1.jpg",1917,2560,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/12\/THESSALONIKI_11_20-scaled-1.jpg",1917,2560,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/12\/THESSALONIKI_11_20-scaled-1-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/12\/THESSALONIKI_11_20-scaled-1-225x300.jpg",225,300,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/12\/THESSALONIKI_11_20-scaled-1-767x1024.jpg",767,1024,true],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/12\/THESSALONIKI_11_20-scaled-1-1150x1536.jpg",1150,1536,true],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/12\/THESSALONIKI_11_20-scaled-1-1534x2048.jpg",1534,2048,true],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/12\/THESSALONIKI_11_20-scaled-1-1080x540.jpg",1080,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/12\/THESSALONIKI_11_20-scaled-1-1140x1522.jpg",1140,1522,true],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/12\/THESSALONIKI_11_20-scaled-1-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/12\/THESSALONIKI_11_20-scaled-1-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/12\/THESSALONIKI_11_20-scaled-1-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"psymeonidou","author_link":"https:\/\/www.emetro.gr\/?author=4"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=79&#038;lang=en\" rel=\"category\">Thessaloniki Base Project progress<\/a>","rttpg_excerpt":"&nbsp; DIMOKRATIAS Station: In progress are works for the installation of the air duct network at level -2. VENIZELOU Station: Diaphragm walls construction works at the southern access, as well as works related to roof slab supporting piles have been completed. AGHIA SOFIA Station: Works for the construction of parapet walls\u2019 terminations at the south&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/17504","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=17504"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/17504\/revisions"}],"predecessor-version":[{"id":19716,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/17504\/revisions\/19716"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/17478"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=17504"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=17504"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=17504"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}