{"id":17338,"date":"2020-11-11T14:55:10","date_gmt":"2020-11-11T12:55:10","guid":{"rendered":"https:\/\/www.emetro.gr\/?p=17338"},"modified":"2024-06-25T13:42:04","modified_gmt":"2024-06-25T10:42:04","slug":"october-2020","status":"publish","type":"post","link":"https:\/\/www.emetro.gr\/?p=17338&lang=en","title":{"rendered":"OCTOBER 2020"},"content":{"rendered":"<p>&nbsp;<\/p>\n<p><strong><u>TZAVELA SHAFT<\/u><\/strong><\/p>\n<p><strong>The following works have been completed:<\/strong><\/p>\n<ul>\n<li>Permanent lining of the bottom of the shaft<\/li>\n<li>Permanent lining of the connecting tunnel<\/li>\n<li>Removal of temporary steel frames for the support of the TBM tunnel<\/li>\n<li>Permanent lining of the perimeter wall of the shaft<\/li>\n<li>Permanent lining of interior parapet wall and staircase<\/li>\n<li>Permanent lining of the slab at level +8.57<\/li>\n<\/ul>\n<p><strong><u>MANIATIKA STATION <\/u><\/strong><\/p>\n<p><strong><u>STATION\u2019s C\/C <\/u><\/strong><\/p>\n<p><strong>The following works have been completed:<\/strong><\/p>\n<ul>\n<li>Waterproofing of perimeter parapet walls<\/li>\n<li>Permanent lining of the foundation (level -4)<\/li>\n<li>Permanent lining of E\/M slab (level -3)<\/li>\n<li>Permanent lining of the ticketing area slab (level -2)<\/li>\n<li>Permanent lining of staircace S4<\/li>\n<li>Permanent lining of E\/M slab (level -1)<\/li>\n<li>Permanent lining of perimeter parapet walls and columns<\/li>\n<li>Permanent lining of the roof slab and staircase S3<\/li>\n<li>Construction of perimeter parapet walls of the station\u2019s main entrance (at street level) and of the inclined part of the main entrance (shed).<\/li>\n<\/ul>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Waterproofing of the roof slab<\/li>\n<li>Construction of masonry walls and execution of plastering works at levels -4,<\/li>\n<\/ul>\n<p>-3, -2 and -1.<\/p>\n<p><strong><u>MAIN TUNNEL OF THE STATION<\/u><\/strong><strong><u> (<\/u><\/strong><strong><u>\u039d\u0391\u03a4\u039c<\/u><\/strong><strong><u>)<\/u><\/strong><\/p>\n<p><strong>The following works have been completed:<\/strong><\/p>\n<ul>\n<li>Permanent lining of the station\u2019s main tunnel<\/li>\n<li>Permanent lining of the deepening area<\/li>\n<li>Permanent lining of the northern and southern headwall<\/li>\n<li>Construction of parapet walls and platform slabs<\/li>\n<li>Secondary grouting of the vault of the main station tunnel<\/li>\n<li>Filling of platform ducts with non-reinforced concrete.<\/li>\n<\/ul>\n<p><strong><u>PIRAEUS STATION\u00a0 <\/u><\/strong><\/p>\n<p><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Waterproofing works under the foundation<\/li>\n<li>Concreting of the foundation slab and placing of non-reinforced concrete over the foundation.<\/li>\n<li>Concreting of platforms and vertical elements underneath the platforms.<\/li>\n<\/ul>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Installation of waterproofing of the station\u2019s parapet walls<\/li>\n<li>Concreting of the station\u2019s perimeter parapet walls and of the parapet walls underneath the platforms<\/li>\n<li>Concreting of E\/M slab<\/li>\n<li>Removal of struts and sleepers of the 3<sup>rd<\/sup> and 4<sup>th<\/sup> rows<\/li>\n<li>Concreting of inner parapet walls and columns<\/li>\n<li>Works for the concreting of the passenger circulation slab.<\/li>\n<\/ul>\n<p><strong><u>ROLOI SHAFT<\/u><\/strong><\/p>\n<p><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Construction of foundation and permanent lining of perimeter parapet walls.<\/li>\n<\/ul>\n<p><strong><u>NATM ACCESS TUNNEL <\/u><\/strong><\/p>\n<p><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Concreting of the permanent lining.<\/li>\n<\/ul>\n<p><strong><u>DIMOTIKO THEATRO STATION <\/u><\/strong><\/p>\n<p><strong><u>MAIN STATION \u2013 AGHIOU KONSTANTINOU SQUARE <\/u><\/strong><\/p>\n<p><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Sealing of the temporary pumping station.<\/li>\n<\/ul>\n<p><strong>The following works are put on hold: <\/strong><\/p>\n<ul>\n<li>Installation of doors at E\/M level.<\/li>\n<\/ul>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Cleaning works<\/li>\n<li>Plastering works at the E\/M, concourse and platform levels<\/li>\n<li>Roof and headwall painting works at platform level<\/li>\n<li>Conservation of the archaeological finds of the Project.<\/li>\n<\/ul>\n<p><strong><u>UNDERGROUND PART OF THE STATION <\/u><\/strong><\/p>\n<p><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Concreting of the permanent lining, parapet walls and platform slab.<\/li>\n<\/ul>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Painting works at the vault.<\/li>\n<\/ul>\n<p><strong>\u00a0<\/strong><strong><u>STAIRCASE GALLERIES <\/u><\/strong><\/p>\n<p><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Concreting of the permanent lining and works related to secondary concreting.<\/li>\n<\/ul>\n<p><strong><u>KORAI SQUARE<\/u><\/strong><strong><u> ENTRANCE AND ACCESS GALLERY <\/u><\/strong><\/p>\n<p><strong>\u00a0<\/strong><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Concreting of the permanent lining, secondary concrete and waterproofing.<\/li>\n<\/ul>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Dismantling of the pile cap beam.<\/li>\n<li>Backfilling \u2013 compaction related works.<\/li>\n<\/ul>\n<p><strong><u>BAKOYIANNI SQUARE ENTRANCE AND ACCESS GALLERY <\/u><\/strong><\/p>\n<p><strong>\u00a0<\/strong><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Waterproofing and concreting of the permanent lining (still pending is the waterproofing detail at the terminating point, at street level)<\/li>\n<li>Secondary concrete at the staircases.<\/li>\n<\/ul>\n<p><strong>The following works are put on hold: <\/strong><\/p>\n<ul>\n<li>Secondary concrete at the access gallery.<\/li>\n<\/ul>\n<p><strong>\u00a0<\/strong><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Waterproofing works at the roof<\/li>\n<li>Backfilling \u2013 compaction related works.<\/li>\n<\/ul>\n<p><strong><u>DELIGIANNI SHAFT<\/u><\/strong><\/p>\n<p><strong>\u00a0<\/strong><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Excavation and temporary retaining up to the final level<\/li>\n<li>Waterproofing, construction of foundation slab and perimeter parapet walls down to -3.0.<\/li>\n<\/ul>\n<p><strong>\u00a0<\/strong><strong><u>PANEPISTIMIO SHAFT &amp; VENTILATION TUNNEL <\/u><\/strong><\/p>\n<p><strong>\u00a0<\/strong><strong>The following works have been completed: <\/strong><\/p>\n<ul>\n<li>Excavation &#8211; temporary retaining<\/li>\n<li>Concreting of the foundation of the shaft\u2019s permanent lining<\/li>\n<li>Concreting of the permanent lining of the connecting tunnel.<\/li>\n<\/ul>\n<p><strong>The following works are in progress: <\/strong><\/p>\n<ul>\n<li>Waterproofing works and installation of reinforcement for the permanent lining of perimeter parapet walls.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; TZAVELA SHAFT The following works have been completed: Permanent lining of the bottom of the shaft Permanent lining of the connecting tunnel Removal of temporary steel frames for the support of the TBM tunnel Permanent lining of the perimeter wall of the shaft Permanent lining of interior parapet wall and staircase Permanent lining of the slab at level +8.57 MANIATIKA STATION STATION\u2019s C\/C The following works have been completed: Waterproofing of perimeter parapet walls Permanent lining of the foundation (level -4) Permanent lining of E\/M slab (level -3) Permanent lining of the ticketing area slab (level -2) Permanent lining of staircace S4 Permanent lining of E\/M slab (level -1) Permanent lining of perimeter parapet walls and columns Permanent lining of the roof slab and staircase S3 Construction of perimeter parapet walls of the station\u2019s main entrance (at street level) and of the inclined part of the main entrance (shed). The following works are in progress: Waterproofing of the roof slab Construction of masonry walls and execution of plastering works at levels -4, -3, -2 and -1. MAIN TUNNEL OF THE STATION (\u039d\u0391\u03a4\u039c) The following works have been completed: Permanent lining of the station\u2019s main tunnel Permanent lining of the deepening area Permanent lining of the northern and southern headwall Construction of parapet walls and platform slabs Secondary grouting of the vault of the main station tunnel Filling of platform ducts with non-reinforced concrete. PIRAEUS STATION\u00a0 The following works have been completed: Waterproofing works under the foundation Concreting of the foundation slab and placing of non-reinforced concrete over the foundation. Concreting of platforms and vertical elements underneath the platforms. The following works are in progress: Installation of waterproofing of the station\u2019s parapet walls Concreting of the station\u2019s perimeter parapet walls and of the parapet walls underneath the platforms Concreting of E\/M slab Removal of struts and sleepers of the 3rd and 4th rows Concreting of inner parapet walls and columns Works for the concreting of the passenger circulation slab. ROLOI SHAFT The following works have been completed: Construction of foundation and permanent lining of perimeter parapet walls. NATM ACCESS TUNNEL The following works have been completed: Concreting of the permanent lining. DIMOTIKO THEATRO STATION MAIN STATION \u2013 AGHIOU KONSTANTINOU SQUARE The following works have been completed: Sealing of the temporary pumping station. The following works are put on hold: Installation of doors at E\/M level. The following works are in progress: Cleaning works Plastering works at the E\/M, concourse and platform levels Roof and headwall painting works at platform level Conservation of the archaeological finds of the Project. UNDERGROUND PART OF THE STATION The following works have been completed: Concreting of the permanent lining, parapet walls and platform slab. The following works are in progress: Painting works at the vault. \u00a0STAIRCASE GALLERIES The following works have been completed: Concreting of the permanent lining and works related to secondary concreting. KORAI SQUARE ENTRANCE AND ACCESS GALLERY \u00a0The following works have been completed: Concreting of the permanent lining, secondary concrete and waterproofing. The following works are in progress: Dismantling of the pile cap beam. Backfilling \u2013 compaction related works. BAKOYIANNI SQUARE ENTRANCE AND ACCESS GALLERY \u00a0The following works have been completed: Waterproofing and concreting of the permanent lining (still pending is the waterproofing detail at the terminating point, at street level) Secondary concrete at the staircases. The following works are put on hold: Secondary concrete at the access gallery. \u00a0The following works are in progress: Waterproofing works at the roof Backfilling \u2013 compaction related works. DELIGIANNI SHAFT \u00a0The following works have been completed: Excavation and temporary retaining up to the final level Waterproofing, construction of foundation slab and perimeter parapet walls down to -3.0. \u00a0PANEPISTIMIO SHAFT &amp; VENTILATION TUNNEL \u00a0The following works have been completed: Excavation &#8211; temporary retaining Concreting of the foundation of the shaft\u2019s permanent lining Concreting of the permanent lining of the connecting tunnel. The following works are in progress: Waterproofing works and installation of reinforcement for the permanent lining of perimeter parapet walls.<\/p>\n","protected":false},"author":12,"featured_media":16749,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[78],"tags":[],"class_list":["post-17338","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-peiraias-project-progress-en"],"rttpg_featured_image_url":{"full":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-13-1.jpg",1024,683,false],"landscape":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-13-1.jpg",1024,683,false],"portraits":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-13-1.jpg",1024,683,false],"thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-13-1-150x150.jpg",150,150,true],"medium":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-13-1-300x200.jpg",300,200,true],"large":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-13-1.jpg",960,640,false],"1536x1536":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-13-1.jpg",1024,683,false],"2048x2048":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-13-1.jpg",1024,683,false],"ashe-slider-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-13-1-1024x540.jpg",1024,540,true],"ashe-full-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-13-1.jpg",1024,683,false],"ashe-list-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-13-1-300x300.jpg",300,300,true],"ashe-grid-thumbnail":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-13-1-500x330.jpg",500,330,true],"ashe-single-navigation":["https:\/\/www.emetro.gr\/wp-content\/uploads\/2020\/09\/KORYDALLOS-13-1-75x75.jpg",75,75,true]},"rttpg_author":{"display_name":"kkatri","author_link":"https:\/\/www.emetro.gr\/?author=12"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.emetro.gr\/?cat=78&#038;lang=en\" rel=\"category\">Piraeus Project progress<\/a>","rttpg_excerpt":"&nbsp; TZAVELA SHAFT The following works have been completed: Permanent lining of the bottom of the shaft Permanent lining of the connecting tunnel Removal of temporary steel frames for the support of the TBM tunnel Permanent lining of the perimeter wall of the shaft Permanent lining of interior parapet wall and staircase Permanent lining of&hellip;","_links":{"self":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/17338","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=17338"}],"version-history":[{"count":1,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/17338\/revisions"}],"predecessor-version":[{"id":19719,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/posts\/17338\/revisions\/19719"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=\/wp\/v2\/media\/16749"}],"wp:attachment":[{"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=17338"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=17338"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emetro.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=17338"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}